Optimization of binary geothermal power systems

被引:0
|
作者
Ghasemi, Hadi [1 ]
Tizzanini, Alessio [2 ,3 ]
Paci, Marco [2 ]
Mitsos, Alexander [1 ,4 ]
机构
[1] MIT, Dept Mech Engn, MIT 3-137, Cambridge, MA 02139 USA
[2] ENEL SpA, Area Tecn Ricerca, I-56122 Pisa, Italy
[3] Politecn Milan, Dept Energy, I-20156 Milan, Italy
[4] Rhein Westfal TH Aachen, D-52056 Aachen, Germany
关键词
Binary Geothermal Power Plant; Organic Rankine Cycle; Optimization; ORGANIC RANKINE CYCLES; FLUIDS; PLANT;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this article, modeling and optimization of two different organic Rankine cycles (ORC) (Power Plant (a) with a recuperator and Power Plant (b) without a recuperator) utilizing geothermal brine (GB) are studied. The developed models for these ORCs include performance characteristics of different components obtained from two existing power plants. The power plants rely on dry cooling (air cooled condenser) and as such exhibit performance degradation for high ambient temperatures. The models are validated with measured data for one-year operation of each power plant. The optimal operations of these power plants are obtained maximizing the net power output. The optimization is performed in Aspen Plus (R). Although in the literature it is suggested that for an ORC, the optimal performance is achieved with no superheat at the inlet of turbine, this statement only holds for low ambient temperatures. Our findings suggest that the optimal value of superheat is a monotonic increasing function of the ambient temperature; in hot days, high values of superheat provide the maximum power output. The new optimal operation boosts the annual power output of the cycles up to 9% in ORC (a) and up to 7% in ORC (b). Furthermore, the findings reveal that for a fixed total flow rate of GB in a year, an optimized operation of power plant increases the revenue by an additional 3.7 % compared to fixed flowrate of brine; this is achieved by a slightly higher flow rate of GB in the low and moderate ambient temperatures and no operation of the plant in the hot hours of the year. This can be economical if the shutdown is combined with plant maintenance.
引用
收藏
页码:391 / 396
页数:6
相关论文
共 50 条
  • [1] Modeling and optimization of a binary geothermal power plant
    Ghasemi, Hadi
    Paci, Marco
    Tizzanini, Alessio
    Mitsos, Alexander
    [J]. ENERGY, 2013, 50 : 412 - 428
  • [2] Modern geothermal power: Binary cycle geothermal power plants
    Tomarov G.V.
    Shipkov A.A.
    [J]. Thermal Engineering, 2017, 64 (4) : 243 - 250
  • [3] Exergoeconomic analysis and optimization of a flash-binary geothermal power system
    Zhao, Yajing
    Wang, Jiangfeng
    [J]. APPLIED ENERGY, 2016, 179 : 159 - 170
  • [4] Thermodynamic analysis and optimization of a flash-binary geothermal power generation system
    Wang, Jianyong
    Wang, Jiangfeng
    Dai, Yiping
    Zhao, Pan
    [J]. GEOTHERMICS, 2015, 55 : 69 - 77
  • [5] Multi-objective particle swarm optimization of binary geothermal power plants
    Clarke, Joshua
    McLeskey, James T., Jr.
    [J]. APPLIED ENERGY, 2015, 138 : 302 - 314
  • [6] Optimization and applicability of compound power cycles for enhanced geothermal systems
    Lu, Xinli
    Zhao, Yangyang
    Zhu, Jialing
    Zhang, Wei
    [J]. APPLIED ENERGY, 2018, 229 : 128 - 141
  • [7] Optimized geothermal binary power cycles
    Kontoleontos, E.
    Karytsas, C.
    Mendrinos, D.
    Georgilakis, P. S.
    [J]. JOURNAL OF OPTOELECTRONICS AND ADVANCED MATERIALS, 2008, 10 (05): : 1228 - 1232
  • [8] Superstructure optimization of geothermal binary combined cooling, heating and power system using life cycle optimization
    Tian X.
    You F.
    [J]. 1717, Italian Association of Chemical Engineering - AIDIC (70): : 1717 - 1722
  • [9] IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY
    Yilmaz, Ceyhun
    [J]. ISI BILIMI VE TEKNIGI DERGISI-JOURNAL OF THERMAL SCIENCE AND TECHNOLOGY, 2020, 40 (01) : 37 - 51
  • [10] Equipment of the binary-cycle geothermal power unit at the Pauzhet geothermal power station
    Tomarov G.V.
    Nikol'Skii A.I.
    Semenov V.N.
    Shipkov A.A.
    [J]. Thermal Engineering, 1600, Izdatel'stvo Nauka (61): : 406 - 410