Risk Assessment of Water Resources Development Plans Using Fuzzy Fault Tree Analysis

被引:16
|
作者
Abedzadeh, Saeedeh [1 ]
Roozbahani, Abbas [1 ]
Heidari, Ali [2 ]
机构
[1] Univ Tehran, Dept Irrigat & Drainage Engn, Aburaihan Campus, Tehran, Iran
[2] Iran Water & Power Resources Dev Co, Tehran, Iran
关键词
FFTA; Risk assessment; Sustainable development; Water resources development; Makran area; SYSTEM; SUSTAINABILITY; MANAGEMENT; FAILURE;
D O I
10.1007/s11269-020-02578-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Water resources development plans (WRDPs) is a key element of evaluation for sustainable water supply due to growing needs for adequate and reliable water resources in the human communities by different biodiversity. The development plans should be assessed considering social, economic, and environmental aspects as the criteria of sustainable development and then the risk assessment of the plans should be carried out using the criteria. In this paper, for the first time, risk-based assessment of WRDPs were carried out under the sustainable development framework using Fuzzy Fault Tree Analysis (FFTA). The failure of the plans was considered as the top event based on sustainable development criteria in this approach and then the factors leading to failure occurrence including social, economic, environmental, and water resources failure indices were identified as 14 basic events (BE) through a top-down process in Fault Tree Analysis (FTA). The case study was the water supply system using conventional and non-conventional water resources for Homozgan province in South of Iran. The water resources development plans were evaluated in a model applying two different approaches of crisp and fuzzy for zone number 4 of Makran coastal area and Bandar Abbas city where play significant role in the economic growth of the country. In the both approaches, the failure probability were 38%, 90%, and 50% for the best, worst, and current situation Scenarios, respectively. Taking into account the high computed risk value in the both crisp and fuzzy approaches, the basic events were ranked based on their contribution in the occurrence of the top event. The proposed approach not only addresses the risk of WRDPs in compliance with sustainable development objectives but also facilitates decision-making for the risk management by prioritizing the factors in the failure of plans.
引用
收藏
页码:2549 / 2569
页数:21
相关论文
共 50 条
  • [1] Risk Assessment of Water Resources Development Plans Using Fuzzy Fault Tree Analysis
    Saeedeh Abedzadeh
    Abbas Roozbahani
    Ali Heidari
    [J]. Water Resources Management, 2020, 34 : 2549 - 2569
  • [2] Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis
    Ardeshir, A.
    Amiri, M.
    Ghasemi, Y.
    Errington, M.
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2014, 12 (4A) : 396 - 412
  • [3] Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis
    [J]. Ardeshir, A., 1600, Iran University of Science and Technology (12):
  • [4] Risk Assessment of Water Treatment Plants Using Fuzzy Fault Tree Analysis and Monte Carlo Simulation
    Massoud Tabesh
    Abbas Roozbahani
    Farhad Hadigol
    Elham Ghaemi
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2022, 46 : 643 - 658
  • [5] Risk Assessment of Water Treatment Plants Using Fuzzy Fault Tree Analysis and Monte Carlo Simulation
    Tabesh, Massoud
    Roozbahani, Abbas
    Hadigol, Farhad
    Ghaemi, Elham
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2022, 46 (01) : 643 - 658
  • [6] Risk Assessment of Agricultural Water Conveyance and Delivery Systems by Fuzzy Fault Tree Analysis Method
    Morteza Babaei
    Abbas Roozbahani
    S. Mehdy Hashemy Shahdany
    [J]. Water Resources Management, 2018, 32 : 4079 - 4101
  • [7] Risk Assessment of Agricultural Water Conveyance and Delivery Systems by Fuzzy Fault Tree Analysis Method
    Babaei, Morteza
    Roozbahani, Abbas
    Shandany, S. Mehdy Hashemy
    [J]. WATER RESOURCES MANAGEMENT, 2018, 32 (12) : 4079 - 4101
  • [8] Risk Assessment in Bridge Construction Projects Using Fault Tree and Event Tree Analysis Methods Based on Fuzzy Logic
    Abdollahzadeh, Gholamreza
    Rastgoo, Sima
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART B-MECHANICAL ENGINEERING, 2015, 1 (03):
  • [9] Risk assessment of shield tunnel construction cost using fuzzy fault tree
    Zheng, Jun-Jie
    Lin, Chi-Feng
    Zhao, Dong-An
    Ding, Lie-Yun
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2011, 33 (04): : 501 - 508
  • [10] Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis
    Abdelgawad, Mohamed
    Fayek, Aminah Robinson
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (04) : 294 - 302