Advanced grid requirements for the integration of wind farms into the Spanish transmission system

被引:44
|
作者
Morales, A. [1 ]
Robe, X. [1 ]
Sala, M. [2 ]
Prats, P. [2 ]
Aguerri, C. [3 ]
Torres, E. [3 ]
机构
[1] Energy Qual SL, Madrid 28046, Spain
[2] Ecotecnia S Coop Cl, Barcelona 08005, Spain
[3] MTorres Grp, Navarra 31119, Torres De Elorz, Spain
关键词
D O I
10.1049/iet-rpg:20070084
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The main purpose of this paper is to present the grid requirements for the integration of wind farms into the Spanish Transmission System. In the particular case of voltage support capability, the Spanish Transmission System Operator (TSO), Red Electrica de Espana (REE) has defined a set of conditions to be met at the point of common coupling of a wind farm, not at terminals of a single wind turbine. A Verification, Validation, and Certification Procedure (VV&CP) to check compliance at terminals of a wind farm has been developed with the contribution and common agreement of all different wind power players and distribution system operators, leaded by the Spanish Wind Energy Association and supervised by REE. The VV&CP solves the problem defining a "Particular Procedure" based on testing or a "General Procedure" based on the simulation of the wind farm behaviour. It is the scope of Energy to Quality in this paper, to discuss and confirm the VV&CP reliability and validity, supported by field testing, validated models of wind turbines and simulation of wind farms. Conclusions are drawn on our efforts towards worldwide harmonization, on the development of a common VV&CP based on the Spanish and German experience.
引用
收藏
页码:47 / 59
页数:13
相关论文
共 50 条
  • [1] Advanced grid requirements for the integration of wind turbines into the german transmission system
    Erlich, I.
    Winter, W.
    Dittrich, A.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 3724 - +
  • [2] Power system integration of wind farms and analysis of grid code requirements
    Rona, Berk
    Guler, Onder
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 49 : 100 - 107
  • [3] Grid integration of wind farms and the interconnection requirements for the U.S. grid
    Ghadiali, Farangmeher
    Xydis, George
    INTERNATIONAL JOURNAL OF EMERGING ELECTRIC POWER SYSTEMS, 2024, 25 (04) : 421 - 428
  • [4] Grid Forming Converters in Offshore Wind Farms for Grid Integration Through Hybrid HVDC Transmission System
    Raza, Muhammad Waleed
    Raza, Muhammad
    INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH, 2022, 12 (03): : 1552 - +
  • [5] SCADA systems for large wind farms: Grid integration and market requirements
    Brobak, B
    Jones, L
    2001 POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2001, : 20 - 21
  • [6] Grid integration of wind farms
    Tande, JOG
    WIND ENERGY, 2003, 6 (03) : 281 - 295
  • [7] Grid connection requirements for wind farms in Europe
    Schlünder, Manuel
    Koschinsky, Markus
    VGB PowerTech, 2006, 86 (10): : 49 - 53
  • [8] Review of advanced grid requirements for the integration of large scale photovoltaic power plants in the transmission system
    Cabrera-Tobar, Ana
    Bullich-Massague, Eduard
    Aragues-Penalba, Monica
    Gomis-Bellmunt, Oriol
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2016, 62 : 971 - 987
  • [9] Measurement System Requirements to Evaluate the Quality of Grid Connections for Offshore Wind Farms
    Ferdinand, Robert
    Cupelli, Marco
    Monti, Antonello
    2017 IEEE INTERNATIONAL INSTRUMENTATION AND MEASUREMENT TECHNOLOGY CONFERENCE (I2MTC), 2017, : 879 - 884
  • [10] Grid integration of large DFIG-based wind farms using VSC transmission
    Xu, Lie
    Yao, Liangzhong
    Sasse, Christian
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (03) : 976 - 984