共 50 条
- [1] PRACTICAL APPLICATION OF AN ADVANCED 12CR-ROTOR TO 593-DEGREES-C-700MW STEAM-TURBINE PLANT TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1992, 78 (06): : 910 - 917
- [2] Thermoeconomic Optimization of a 1000MW coal-fired Unit MATERIALS RESEARCH AND APPLICATIONS, PTS 1-3, 2014, 875-877 : 1744 - 1747
- [3] AN ADVANCED 12CR STEEL ROTOR APPLICABLE TO ELEVATED STEAM TEMPERATURE 593-DEGREES-C JOURNAL OF ENGINEERING MATERIALS AND TECHNOLOGY-TRANSACTIONS OF THE ASME, 1987, 109 (04): : 319 - 325
- [5] Emission Characteristics of Mercury in 1000MW Ultra-supercritical Coal-fired Unit Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2021, 41 (20): : 7039 - 7045
- [6] Deactivation of commercial SCR catalyst used in 1000MW coal-fired power plant Zhongguo Huanjing Kexue/China Environmental Science, 2019, 39 (02): : 583 - 590
- [7] Research on the Performance of 1000MW Supercritical Carbon Dioxide Power Cycle Coal-fired Unit Under Off-design Conditions Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2023, 43 (17): : 6681 - 6687
- [8] New steels for advanced coal fired plant up to 620 degrees C INTERNATIONAL CONFERENCE ON ADVANCED STEAM PLANT - NEW MATERIALS AND PLANT DESIGNS AND THEIR PRACTICAL IMPLICATIONS FOR FUTURE CCGT AND CONVENTIONAL POWER STATIONS, 1997, 1997 (02): : 189 - 199
- [9] Simulator Development of 1000MW Class Ultra Super Critical Coal-Fired Power Plant with advanced control algorithm IMETI 2008: INTERNATIONAL MULTI-CONFERENCE ON ENGINEERING AND TECHNOLOGICAL INNOVATION, VOL II, PROCEEDINGS, 2008, : 339 - +
- [10] I and C design of 300 MW coal-fired demonstrative power plant Zhongguo Dianli/Electric Power, 2001, 34 (12):