Comparison and analysis on specification of X80 line pipe for 2nd West-East Gas Transmission Pipeline Project

被引:0
|
作者
Ma Qiurong [1 ]
Huo Chunyong [1 ]
机构
[1] CNPC, Tubular Goods Res Ctr, Xian 710065, Peoples R China
关键词
The 2nd West-East Gas Pipeline Project (2nd WEGP); Welded pipe; Strain-aging;
D O I
暂无
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Specification of X80 line pipe for 2nd West-East Gas Transmission Pipeline Project has referenced in context to the latest edition of international standards like ISO 3183 and API Spec 5L. Some complementarities have been made to achieve the balance between the safety and economy of the high-pressure gas transmission system, such as in the chemical content, tensile strength, arrest toughness, etc. The line pipe specification was analyzed combining with the properties of the practically manufactured pipe in this paper. It's shown that the pipe manufactures have established the steel design process for X80 pipes and the pipeline designers have been developing the design method of high-pressure gas pipelines with X80 line pipe. As the collaboration between the pipe manufactures and pipeline designers, X80 line pipes are applicable in 2nd West-East Gas Transmission Pipeline Project commercially.
引用
下载
收藏
页码:699 / 705
页数:7
相关论文
共 20 条
  • [1] Development and Application of High Performance X80 Line Pipe for the 2nd West-East Gas Pipeline
    LI He-lin 1
    2. . School of Material Science and Engineering
    3. School of Material Science and Engineering
    Journal of Iron and Steel Research(International), 2011, 18 (S1) : 39 - 48
  • [2] Development and Application of High Performance X80 Line Pipe for the 2nd West-East Gas Pipeline
    Li He-lin
    Huo Chun-yong
    Ji Ling-kang
    Li Yang
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2011, 18 : 39 - 48
  • [3] Application HTP Process to Produce X80 Strip for 2nd West-East Gas Pipeline Project
    LI Yong-dong 1
    2.Qian’an Iron and Steel Company of Shougang Group
    Journal of Iron and Steel Research(International), 2011, 18 (S1) : 471 - 477
  • [4] Application HTP Process to Produce X80 Strip for 2nd West-East Gas Pipeline Project
    Li Yong-dong
    Li Ming
    Zhang Yong-qing
    Jin Wei
    Liu Jian-hui
    Li Fei
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2011, 18 : 471 - 477
  • [5] THE DEVELOPMENT OF X80 STEEL PLATE AND COIL FOR THE 2ND WEST-EAST PIPELINE PROJECT
    Yin Yuqun
    Huang Yixin
    Yao Yongkuan
    Wang Daoyuan
    Wu Yonglong
    Stalheim, Douglas G.
    IPC2008: PROCEEDINGS OF THE ASME INTERNATIONAL PIPELINE CONFERENCE - 2008, VOL 3, 2009, : 147 - 155
  • [10] Material Performance Data Acquisition and Management System for Welded Pipe Used in the 2nd West-East Gas Pipeline
    Liu, Bailin
    Chen, Wen
    Lei, Li
    Xiong, Qinren
    FRONTIERS OF MATERIALS, CHEMICAL AND METALLURGICAL TECHNOLOGIES, PTS 1 AND 2, 2012, 581-582 : 1176 - +