共 50 条
- [1] PROBLEM SOLVING OF DESIGN AND PLANNING OF OPEN PIT MINING IN MINEFRAME SYSTEM [J]. JOURNAL OF MINING INSTITUTE, 2012, 198 : 49 - 54
- [3] The value of additional drilling to open pit mining projects [J]. Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models, 2005, (14): : 225 - 232
- [4] Rain Forecasting for Production Capacity Planning at Open Pit Mining [J]. 2019 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL AND BUSINESS ENGINEERING (ICIBE 2019), 2019, : 349 - 353
- [5] Integrating multiple simulations and mining dilution in open pit optimisation algorithms [J]. Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models, 2005, (14): : 297 - 302
- [6] THE CONCEPT OF A SYSTEM OF CONTINUOUS IMPROVEMENT OF THE PRODUCTION PROCESS OF OPEN-PIT COAL MINING [J]. PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2021, 4 : 489 - 500
- [8] VALUE-OPTIMAL DESIGN OF RAMPS IN OPEN PIT MINING [J]. ARCHIVES OF MINING SCIENCES, 2019, 64 (02) : 399 - 413
- [9] Feasibility of discharging tailing in the open pit of Fengshan copper mine using transforming open-pit into underground mining [J]. CIVIL ENGINEERING AND URBAN PLANNING III, 2014, : 191 - 194