Increasing the value and feasibility of open pit plans by integrating the mining system into the planning process

被引:2
|
作者
Morales, N. [1 ,2 ]
Reyes, P. [1 ,2 ,3 ]
机构
[1] Univ Chile, DELPHOS Mine Planning Lab, Min Engn Dept, Santiago, Chile
[2] Univ Chile, Adv Min Technol Ctr, Santiago, Chile
[3] Univ Santiago de Compostela, Technol Inst Ind Math ITMATI, Santiago De Compostela, Spain
关键词
mine planning; optimization; open pit; cheduling; multi-destination; mining system;
D O I
10.17159/2411-9717/2016/v116n7a8
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
We present a model that allows us to consider mine production scheduling coupled with the mining system at different levels of detail: from the standard origin-destination approach to a network considering different processing paths. Each of these is characterized by variable costs, capacities, and geometallurgical constraints. We then apply this model to a real mine, comparing the results with those obtained by traditional methodology: the destination of materials defined a priori, before computing the schedules, using standard criteria like cut-off grades. As expected, using optimization to schedule and define dynamically the best processing alternatives shows a big opportunity for potential value improvement. However, the main result is that using only origin-destination and fixed cut-off grades may produce schedules that are not feasible when the actual constraints of the mining system are taken into account. Therefore, it is essential to include the considerations proposed in the planning process.
引用
收藏
页码:663 / 672
页数:10
相关论文
共 50 条
  • [1] PROBLEM SOLVING OF DESIGN AND PLANNING OF OPEN PIT MINING IN MINEFRAME SYSTEM
    Nagovitsyn, O. V.
    Lukichev, S. V.
    Alisov, A. Yu.
    [J]. JOURNAL OF MINING INSTITUTE, 2012, 198 : 49 - 54
  • [2] AUTOMATIC DESIGN AND PLANNING SYSTEM FOR THE OPEN-PIT MINING OF COAL DEPOSITS
    TANAINO, AS
    BOTVINNIK, AA
    TETENOV, EV
    [J]. JOURNAL OF MINING SCIENCE, 1994, 30 (02) : 181 - 186
  • [3] The value of additional drilling to open pit mining projects
    Froyland, G.
    Menabde, M.
    Stone, P.
    Hodson, D.
    [J]. Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models, 2005, (14): : 225 - 232
  • [4] Rain Forecasting for Production Capacity Planning at Open Pit Mining
    Komarudin
    David
    [J]. 2019 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL AND BUSINESS ENGINEERING (ICIBE 2019), 2019, : 349 - 353
  • [5] Integrating multiple simulations and mining dilution in open pit optimisation algorithms
    Richmond, A.
    [J]. Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models, 2005, (14): : 297 - 302
  • [6] THE CONCEPT OF A SYSTEM OF CONTINUOUS IMPROVEMENT OF THE PRODUCTION PROCESS OF OPEN-PIT COAL MINING
    Yakovlev, V. L.
    Kilin, A. B.
    Galkin, V. A.
    Makarov, A. M.
    [J]. PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2021, 4 : 489 - 500
  • [7] A novel framework for integrating environmental costs and carbon pricing in open-pit mine plans: Towards sustainable and green mining
    Mirzehi, Mohammad
    Afrapoli, Ali Moradi
    [J]. JOURNAL OF CLEANER PRODUCTION, 2024, 468
  • [8] VALUE-OPTIMAL DESIGN OF RAMPS IN OPEN PIT MINING
    Nancel-Penard, Pierre
    Parra, Andres
    Morales, Nelson
    Diaz, Cristopher
    Widzyk-Capehart, Eleonora
    [J]. ARCHIVES OF MINING SCIENCES, 2019, 64 (02) : 399 - 413
  • [9] Feasibility of discharging tailing in the open pit of Fengshan copper mine using transforming open-pit into underground mining
    Xia, Liang
    Xia, Shi-you
    [J]. CIVIL ENGINEERING AND URBAN PLANNING III, 2014, : 191 - 194
  • [10] Automatic generation of feasible mining pushbacks for open pit strategic planning
    Bai, X.
    Marcotte, D.
    Gamache, M.
    Gregory, D.
    Lapworth, A.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (05) : 515 - 530