A production planning method for mass customization

被引:0
|
作者
Zheng, HL [1 ]
Wan, XY [1 ]
Liu, F [1 ]
Cui, JH [1 ]
Wu, LJ [1 ]
机构
[1] Chongqing Univ, Inst Mfg Engn, Chongqing 400044, Peoples R China
关键词
mass customization; product structure; BOM; production planning; selective components;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Based on the analysis of the fundamental thoughts of mass customization, the production characteristics and product structure, the occurring problems in coding process of product items, the definition of product structure and production planning under the traditional MRPII system are discussed. It provides the method to identify the customized product code by product family code and customer order number. In virtue of the technology of expert system and the establishment of product family structure and product configuration knowledge base, the dynamic customized BOM can be engendered. Meanwhile, a production planning method oriented to mass customization is presented. For standard product and its module for all-purpose, the standard MRPII production mode has been adopted. As for customized product, the production and assembly plan can be operated based on standard product and its general module. Finally, this system offers customized product with specific characteristics to customers and implements the integration with standard MRPII system.
引用
下载
收藏
页码:219 / 225
页数:7
相关论文
共 50 条
  • [2] Production planning and controlling under mass customization production environment
    Li, Hongyu
    Yan, Haoyun
    PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 1051 - 1057
  • [3] Research of Electrical Product Production Planning for Mass Customization
    Hu Qinghe
    Zhang Shuang
    Wang Xingwei
    ISCSCT 2008: INTERNATIONAL SYMPOSIUM ON COMPUTER SCIENCE AND COMPUTATIONAL TECHNOLOGY, VOL 1, PROCEEDINGS, 2008, : 123 - +
  • [4] Computer aided production planning System for mass customization
    Rong, Y
    Yao, S
    Han, X
    Yang, Y
    CONCURRENT ENGINEERING: THE WORLDWIDE ENGINEERING GRID, PROCEEDINGS, 2004, : 1147 - 1152
  • [5] The method of making production activity scheduling in mass customization
    Ma YuFang
    Ying MingYou
    PROCEEDINGS OF THE 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING - MANAGEMENT AND ORGANIZATION STUDIES SECTION, 2007, : 95 - 100
  • [6] FROM MASS PRODUCTION TO MASS CUSTOMIZATION
    Fung, Ada Yin Suen
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON TALL BUILDINGS, 2010, : 25 - 38
  • [7] Project planning method for engineering-to-order product mass customization
    Su, Shao-Hui
    Ji, Yang-Jian
    Qi, Guo-Ning
    Chen, Guo-Jin
    Zhejiang Daxue Xuebao(Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (10): : 1833 - 1840
  • [8] Two stage optimization method of cut order planning for apparel mass customization
    Liu, Yan-Mei
    Yan, Shao-Cong
    Ji, Yang-Jian
    Qi, Guo-Ning
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (03): : 479 - 485
  • [9] A Data-Driven Method for Decision Support Systems in Mass Production and Mass Customization
    Yetis, Hasan
    Karakose, Mehmet
    2018 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND DATA PROCESSING (IDAP), 2018,
  • [10] Production planning with flexible customization using a branch-price-cut method
    Ng, Tsan Sheng Adam
    Johnson, Ellis L.
    IIE TRANSACTIONS, 2008, 40 (12) : 1198 - 1210