共 50 条
- [1] Application of decision support metrics for effective risk-informed asset management [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2004 PROCEEDINGS, 2004, : 615 - 620
- [7] Probabilistic Contingency Analysis for Risk-Informed Decision Making Processes in Electric Grids [J]. PROCEEDINGS OF THE 14TH INTERNATIONAL SCIENTIFIC CONFERENCE ELECTRIC POWER ENGINEERING 2013, 2013, : 743 - 745
- [8] 6.5.2 Modeling and Analysis Framework for Risk-Informed Decision Making for FAA NextGen [J]. 1600, John Wiley and Sons Inc (23):
- [9] Asset management and cost saving maintenance strategy based on risk-informed decision making [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 951 - 956