Research on Comprehensive Post-evaluation of Electric Transmission Project Based on Fuzzy AHP Analysis Method

被引:2
|
作者
Zheng Lixin [1 ]
机构
[1] North China Elect Power Univ, Elect & Elect Engn Sch, Beijing 102206, Peoples R China
关键词
Electric transmission project; post-evaluation; index system; fuzzy AHP evaluation model;
D O I
10.4028/www.scientific.net/AMM.415.280
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Post-evaluation of power transmission project will help improve the scientific management level of the construction implementation and operation process, the investment decision-making and returns, and ensure the safe operation of power grid. Based on the theories and methods to establish the evaluation index, considering the low-carbon economy requirements on power grid construction, this article established a post-evaluation index system from the perspective of implementation process, effectiveness and efficiency, social and environmental impact, and sustainable development. According to the content of post-evaluation of power transmission project, it built a fuzzy AHP comprehensive post-evaluation model and took power transmission project as an example to analyze the application of the model.
引用
收藏
页码:280 / 286
页数:7
相关论文
共 50 条
  • [1] Comprehensive Post-Evaluation of Rural Electric Network Reformation based on Fuzzy Interval Number AHP
    Li Cheng-ren
    [J]. 2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 171 - 177
  • [2] Technical post-evaluation on power transmission and transformation project based on comprehensive evaluation method
    Wei, Gang
    Yang, Yi
    Wang, Jian
    Zhou, Bing
    [J]. Dianwang Jishu/Power System Technology, 2010, 34 (03): : 112 - 116
  • [3] PROJECT POST-EVALUATION VIA AHP
    SINUANYSTERN, Z
    AMITAI, A
    [J]. PRODUCTION PLANNING & CONTROL, 1994, 5 (04) : 337 - 341
  • [4] Study on Application of Successful Degree and Fuzzy Comprehensive Evaluation Method to Construction Engineering Project Post-Evaluation
    Yang Bo
    Huang Ying
    Li Huimin
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2620 - 2623
  • [5] Research on Information & Communication Network Project Post-Evaluation Technology Based on Fuzzy Set
    Zhao Ziyan
    Liu Jianming
    [J]. 12TH ANNUAL MEETING OF CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY ON INFORMATION AND COMMUNICATION TECHNOLOGY AND SMART GRID, 2010, : 366 - +
  • [6] A research on comprehensive effect post-evaluation on R&D project
    Pan An'e
    Yang Qing
    [J]. Proceedings of 2005 International Conference on Innovation & Management, 2005, : 992 - 994
  • [7] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation
    Zhang Xi-rong
    Li Zhi
    Shen Yao-jie
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
  • [8] Research of the equipment selected based on AHP and fuzzy comprehensive evaluation method
    Chai Furong
    Wang Hongjun
    [J]. PROCEEDINGS OF THE FIFTH INTERNATIONAL SYMPOSIUM ON TEST AUTOMATION & INSTRUMENTATION, VOLS 1 AND 2, 2014, : 565 - 569
  • [9] Comprehensive Evaluation of Thermal Power Denitration Project Based on Fuzzy AHP Method
    Zhao, Jianna
    Liu, Jiazhen
    [J]. 2014 INTERNATIONAL CONFERENCE ON ENVIRONMENTAL POLLUTION AND PUBLIC HEALTH (EPPH 2014), VOL 3, 2014, 3 : 67 - 72
  • [10] The Post-evaluation of Residential Real Estate Based on Entropy Fuzzy Comprehensive Evaluation
    Guo Bin
    He Yanyan
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2010, : 215 - 219