Risk attitudes in risk-based design: Considering risk attitude using utility theory in risk-based design

被引:22
|
作者
Van Bossuyt, Douglas [1 ]
Hoyle, Chris [1 ]
Tumer, Irem Y. [1 ]
Dong, Andy [2 ]
机构
[1] Oregon State Univ, Complex Engineered Syst Design Lab, Sch Mech Ind & Mfg Engn, Corvallis, OR 97331 USA
[2] Univ Sydney, Fac Engn & Informat Technol, Sydney, NSW 2006, Australia
基金
美国国家科学基金会;
关键词
Decision Support; Engineering Domain-Specific Risk-Taking Test; Risk Appetite; Risk-Based Design; Utility Theory; DECISION; EXPLORATION;
D O I
10.1017/S0890060412000261
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Engineering risk methods and tools account for and make decisions about risk using an expected-value approach. Psychological research has shown that stakeholders and decision makers hold domain-specific risk attitudes that often vary between individuals and between enterprises. Moreover, certain companies and industries (e. g., the nuclear power industry and aerospace corporations) are very risk-averse whereas other organizations and industrial sectors (e. g., IDEO, located in the innovation and design sector) are risk tolerant and actually thrive by making risky decisions. Engineering risk methods such as failure modes and effects analysis, fault tree analysis, and others are not equipped to help stakeholders make decisions under risk-tolerant or risk-averse decision-making conditions. This article presents a novel method for translating engineering risk data from the expected-value domain into a risk appetite corrected domain using utility functions derived from the psychometric Engineering Domain-Specific Risk-Taking test results under a single-criterion decision-based design approach. The method is aspirational rather than predictive in nature through the use of a psychometric test rather than lottery methods to generate utility functions. Using this method, decisions can be made based upon risk appetite corrected risk data. We discuss development and application of the method based upon a simplified space mission design in a collaborative design-center environment. The method is shown to change risk-based decisions in certain situations where a risk-averse or risk-tolerant decision maker would likely choose differently than the expected-value approach dictates.
引用
收藏
页码:393 / 406
页数:14
相关论文
共 50 条
  • [1] Risk-based corrosion design
    Smart, John S.
    [J]. MATERIALS PERFORMANCE, 2006, 45 (08) : 8 - 8
  • [2] Risk-Based Fatigue Design Considering Inspections and Maintenance
    Mendoza, Jorge
    Bismut, Elizabeth
    Straub, Daniel
    Kohler, Jochen
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2021, 7 (01)
  • [3] Granular Risk-Based Design Optimization
    Hu, Hao
    Li, Gang
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2015, 23 (02) : 340 - 353
  • [4] Risk-based Design Security Analysis
    Sion, Laurens
    Yskout, Koen
    Van Landuyt, Dimitri
    Joosen, Wouter
    [J]. 2018 IEEE/ACM 1ST INTERNATIONAL WORKSHOP ON SECURITY AWARENESS FROM DESIGN TO DEPLOYMENT (SEAD), 2018, : 11 - 18
  • [5] Risk-based design of naval combatants
    Boulougouris, Evangelos
    Papanikolaou, Apostolos
    [J]. OCEAN ENGINEERING, 2013, 65 : 49 - 61
  • [6] Risk-Based Approach in Geotechnical Design
    Kannan, Ramanujachari
    [J]. GEO-RISK 2017: RELIABILITY-BASED DESIGN AND CODE DEVELOPMENTS, 2017, (283): : 524 - 533
  • [7] INITIATIVE FOR RISK-BASED FLOOD DESIGN
    DAWDY, DR
    LETTENMAIER, DP
    [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1987, 113 (08): : 1041 - 1051
  • [8] Risk-based in situ bioremediation design
    Smalley, JB
    Minsker, BS
    [J]. IN SITU AND ON-SITE BIOREMEDIATION, VOL 4, 1997, 4(4) (04): : 353 - 358
  • [9] RISK-BASED EVALUATION OF DESIGN CRITERIA
    ELLINGWOOD, BR
    ANG, AHS
    [J]. JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1974, 100 (NST9): : 1771 - 1788
  • [10] Risk-based process plant design considering inherent safety
    Rathnayaka, Samith
    Khan, Faisal
    Amyotte, Paul
    [J]. SAFETY SCIENCE, 2014, 70 : 438 - 464