Multi-period hedging and coordination in a prefabricated construction supply chain

被引:34
|
作者
Zhai, Yue [1 ]
Fu, Yelin [2 ,3 ]
Xu, Gangyan [4 ]
Huang, George [3 ]
机构
[1] Beijing Jiaotong Univ, Sch Econ & Management, Dept Logist Management, Beijing, Peoples R China
[2] Shenzhen Univ, Coll Econ, Shenzhen, Peoples R China
[3] Univ Hong Kong, Dept Ind & Mfg Syst Engn, HKU ZIRI Lab Phys Internet, Pokfulam Rd, Hong Kong, Peoples R China
[4] Harbin Inst Technol, Sch Architecture, Shenzhen, Guangdong, Peoples R China
关键词
game theory; supply chain coordination; uncertainty; operational hedging; construction supply chain management; MANAGED INVENTORY SYSTEMS; REORDER POINT; PROJECTS; PERFORMANCE; QUANTITY; CONTRACT; UNCERTAINTY; EQUIPMENT; SELECTION; DEMAND;
D O I
10.1080/00207543.2018.1512765
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, a multi-period buffer space hedging coordination between a building contractor (BC) and a logistics provider (LP) is investigated. In order to facilitate the application of the construction lead-time hedging (CLTH) strategy, adopted by the BC, extra buffer space needs to be reserved at LP's intermediate warehouse for contingency usage. This strategy is defined as 'buffer space hedging (BSH)' and it increases the pressure of LP on involving extra storage and maintenance cost. Two coordination mechanisms are adopted for solving this BSH problem. One scheme is by introducing a cost-sharing term. A Nash game model is studied to find the individual optimal decisions. Another scheme is a cooperative game model with proper side-payments. We show that adjusting the BSH amount for each review period benefits the supply chain. Both coordination mechanisms enable a win-win outcome. Especially, if system resources are sufficient, the cooperative game outperforms the Nash game. Numerical experiments further demonstrate that the benefit of the proposed model is more significant under the case with lower unit enlarging/rearrangement cost, higher tardiness penalty and unpredictable and uncontrollable construction process-determined assembled and installed prefabs.
引用
收藏
页码:1949 / 1971
页数:23
相关论文
共 50 条
  • [1] Buffer space hedging and coordination in prefabricated construction supply chain management
    Zhai, Yue
    Zhong, Ray Y.
    Huang, George Q.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 200 : 192 - 206
  • [2] Shipment lead time hedging and coordination in prefabricated construction supply chain
    Wang, Zhenyi
    Wang, Haizi
    Zhang, Shibin
    Qiu, Shuai
    [J]. RAIRO-OPERATIONS RESEARCH, 2024, 58 (03) : 2143 - 2166
  • [3] Production lead-time hedging and coordination in prefabricated construction supply chain management
    Zhai, Yue
    Zhong, Ray Y.
    Li, Zhi
    Huang, George
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (14) : 3984 - 4002
  • [4] Research on Time Coordination Strategy of Supply Chain under Multi-Period
    Huo Hong
    Duan Yanmei
    [J]. ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 270 - 274
  • [5] Procurement Decisions in Multi-period Supply Chain
    Nielsen, Izabela
    Saha, Subrata
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR DATA-DRIVEN, INTELLIGENT, COLLABORATIVE, AND SUSTAINABLE MANUFACTURING, APMS 2018, 2018, 535 : 433 - 442
  • [6] A multi-period ordering policy in supply chain
    Wei, C. C.
    Chen, L. T.
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1649 - +
  • [7] Construction of Equilibria in Strategic Stackelberg Games in Multi-Period Supply Chain Contracts
    Gholami, Reza Azad
    Sandal, Leif Kristoffer
    Uboe, Jan
    [J]. GAMES, 2022, 13 (06):
  • [8] Multi-Period Multi-Retailer Supply Chain Models with Wholesale Price Coordination Experiment
    Tantiwattanakul, Phattarasaya
    Dumrongsiri, Aussadavut
    [J]. 2018 2ND INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE COMPILATION, COMPUTING AND COMMUNICATIONS (HP3C 2018), 2018, : 83 - 87
  • [9] Quality supervision and coordination of logistic service supply chain under multi-period conditions
    Liu, Wei-hua
    Xie, Dong
    Xu, Xue-cai
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 142 (02) : 353 - 361
  • [10] MULTI-PERIOD SUPPLY CHAIN COORDINATION USING TRADE PROMOTION: COMPLEMENTARY SLACKNESS APPROACH
    Tantiwattanakul, Phattarasaya
    Dumrongsiri, Aussadavut
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2019, 26 (04): : 555 - 587