共 50 条
- [2] Culvert construction under I-89 in Vermont using the sequential excavation method [J]. Proceedings - Rapid Excavation and Tunneling Conference, 2019, 2019-June : 1000 - 1009
- [3] Study on the Excavation Method of Cable Tunnel on Existing Subway Tunnel [J]. 3RD AASRI CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND BIOINFORMATICS (CIB 2015), 2015, : 32 - 34
- [6] Key Technology of Reverse Excavation at Tunnel Portal [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
- [7] Study on the mechanical behavior of excavation and support construction of shallow tunnel [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1693 - +
- [8] Numerical simulation for the excavation in tunnel construction [J]. ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 90 - +
- [9] Parametric study of displacements on sequential and full-face tunnel excavation [J]. UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 639 - 643
- [10] Rockburst Hazard Control Using the Excavation Compensation Method (ECM): A Case Study in the Qinling Water Conveyance Tunnel [J]. ENGINEERING, 2024, 34 : 154 - 163