共 50 条
- [2] A Model for Optimizing Railway Alignment Considering Bridge Costs, Tunnel Costs, and Transition Curves [J]. Urban Rail Transit, 2019, 5 : 207 - 224
- [5] OPTIMIZING PUMP OPERATING COSTS [J]. JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1983, 75 (10): : 502 - 509
- [6] ALLOCATION OF COSTS TO VARIOUS ROAD USERS HAVING REGARD TO ALIGNMENT STRENGTH WEAR AND TEAR CONSTRUCTION COSTS AND WEIGHT [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1968, 39 (FEB): : 339 - &
- [8] Optimizing water well productivity and operating costs [J]. WATER-ENGINEERING & MANAGEMENT, 1996, 143 (05): : 34 - 36
- [10] Optimizing pipeline construction costs: A case study [J]. Pipes and Pipelines International, 2002, 47 (02): : 5 - 15