Emergency response to the nuclear accident at the Fukushima Daiichi Nuclear Power Plants using mobile rescue robots

被引:401
|
作者
Nagatani, Keiji [1 ]
Kiribayashi, Seiga [1 ]
Okada, Yoshito [1 ]
Otake, Kazuki [1 ]
Yoshida, Kazuya [1 ]
Tadokoro, Satoshi [2 ]
Nishimura, Takeshi [3 ]
Yoshida, Tomoaki [3 ]
Koyanagi, Eiji [3 ]
Fukushima, Mineo [4 ]
Kawatsuma, Shinji [4 ]
机构
[1] Tohoku Univ, Grad Sch Engn, Aoba Ku, Sendai, Miyagi 9808579, Japan
[2] Tohoku Univ, Grad Sch Informat Sci, Aoba Ku, Sendai, Miyagi 9808579, Japan
[3] Chiba Inst Technol, Narashino, Chiba 2750016, Japan
[4] Japan Atom Energy Agcy, Tokai, Ibaraki 3191184, Japan
基金
日本学术振兴会;
关键词
PLATFORM;
D O I
10.1002/rob.21439
中图分类号
TP24 [机器人技术];
学科分类号
080202 ; 1405 ;
摘要
On March 11, 2011, a massive earthquake (magnitude 9.0) and accompanying tsunami hit the Tohoku region of eastern Japan. Since then, the Fukushima Daiichi Nuclear Power Plants have been facing a crisis due to the loss of all power that resulted from the meltdown accidents. Three buildings housing nuclear reactors were seriously damaged from hydrogen explosions, and, in one building, the nuclear reactions became out of control. It was too dangerous for humans to enter the buildings to inspect the damage because radioactive materials were also being released. In response to this crisis, it was decided that mobile rescue robots would be used to carry out surveillance missions. The mobile rescue robots needed could not be delivered to the Tokyo Electric Power Company (TEPCO) until various technical issues were resolved. Those issues involved hardware reliability, communication functions, and the ability of the robots' electronic components to withstand radiation. Additional sensors and functionality that would enable the robots to respond effectively to the crisis were also needed. Available robots were therefore retrofitted for the disaster reponse missions. First, the radiation tolerance of the electronic componenets was checked by means of gamma ray irradiation tests, which were conducted using the facilities of the Japan Atomic Energy Agency (JAEA). The commercial electronic devices used in the original robot systems operated long enough (more than 100 h at a 10% safety margin) in the assumed environment (100 mGy/h). Next, the usability of wireless communication in the target environment was assessed. Such tests were not possible in the target environment itself, so they were performed at the Hamaoka Daiichi Nuclear Power Plants, which are similar to the target environment. As previously predicted, the test results indicated that robust wireless communication would not be possible in the reactor buildings. It was therefore determined that a wired communication device would need to be installed. After TEPCO's official urgent mission proposal was received, the team mounted additional devices to facilitate the installation of a water gauge in the basement of the reactor buildings to determine flooding levels. While these preparations were taking place, prospective robot operators from TEPCO trained in a laboratory environment. Finally, one of the robots was delivered to the Fukushima Daiichi Nuclear Power Plants on June 20, 2011, where it performed a number of important missions inside the buildings. In this paper, the requirements for the exploration mission in the Fukushima Daiichi Nuclear Power Plants are presented, the implementation is discussed, and the results of the mission are reported. (C) 2012 Wiley Periodicals, Inc.
引用
收藏
页码:44 / 63
页数:20
相关论文
共 50 条
  • [1] US EPA RESPONSE TO THE FUKUSHIMA DAIICHI NUCLEAR POWER PLANT ACCIDENT
    Tupin, Edward A.
    Boyd, Michael A.
    Mosser, Jennifer E.
    Wieder, Jessica S.
    [J]. HEALTH PHYSICS, 2012, 102 (05): : 563 - 569
  • [2] THE ACCIDENT AT THE FUKUSHIMA DAIICHI NUCLEAR POWER PLANT IN 2011
    Tominaga, Takako
    Hachiya, Misao
    Tatsuzaki, Hideo
    Akashi, Makoto
    [J]. HEALTH PHYSICS, 2014, 106 (06): : 630 - 637
  • [3] Examining the Nuclear Accident at Fukushima Daiichi
    Blandford, Edward D.
    Ahn, Joonhong
    [J]. ELEMENTS, 2012, 8 (03) : 189 - 194
  • [4] Dose assessment for emergency workers in early phase of Fukushima Daiichi nuclear power plant accident
    Sadeghi, N.
    Ahangari, R.
    Kasesaz, Y.
    Noori-Kalkhoran, O.
    [J]. KERNTECHNIK, 2017, 82 (05) : 562 - 571
  • [5] THE FUKUSHIMA DAIICHI NUCLEAR ACCIDENT-AN OVERVIEW
    Thielen, Harald
    [J]. HEALTH PHYSICS, 2012, 103 (02): : 169 - 174
  • [6] Emergency response by robots to Fukushima-Daiichi accident: summary and lessons learned
    Kawatsuma, Shinji
    Fukushima, Mineo
    Okada, Takashi
    [J]. INDUSTRIAL ROBOT-THE INTERNATIONAL JOURNAL OF ROBOTICS RESEARCH AND APPLICATION, 2012, 39 (05): : 428 - 435
  • [7] RADIOIODINE CONTAMINATION CAUSED BY THE FUKUSHIMA DAIICHI NUCLEAR POWER PLANT ACCIDENT
    Ohno, Takeshi
    [J]. ELEMENTS, 2022, 18 (01) : 7 - 8
  • [8] Simulation of radionuclide dispersion of Fukushima Daiichi Nuclear Power Plant accident
    Northwest Institute of Nuclear Technology, Xi'an 710024, China
    不详
    [J]. Yuanzineng Kexue Jishu, 1600, 12 (1533-1536):
  • [9] Lessons learned from the Fukushima Daiichi Nuclear Power Plant accident
    Narabayashi, T.
    [J]. THMT-12. PROCEEDINGS OF THE SEVENTH INTERNATIONAL SYMPOSIUM ON TURBULENCE, HEAT AND MASS TRANSFER, 2012, : 49 - 60
  • [10] Water Hammers Exploded the Nuclear Power Plants at Fukushima Daiichi
    Leishear, Robert A. A.
    [J]. JOURNAL OF NUCLEAR ENGINEERING AND RADIATION SCIENCE, 2023, 9 (01):