Earthquake and Underground Powerhouse: On the Aseismic Issues of Baihetan Underground Cavern Complex

被引:0
|
作者
Leng, Xianlun [1 ]
Liu, Jiajin
Cui, Zhen [1 ]
Sheng, Qian [1 ]
机构
[1] Chinese Acad Sci, State Key Lab Geomech & Geotech Engn, Inst Rock & Soil Mech, Wuhan 430071, Peoples R China
关键词
Underground cavern complex; The Baihetan hydropower plant; Earthquake disaster; Seismic stability; Supporting measure;
D O I
10.4028/www.scientific.net/AMR.594-597.1753
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A hydropower plant is usually the major electricity supplier in the region, the failure of underground powerhouse in an earthquake may cause not only the damage to itself, but also secondary disasters to the region in a way of an electricity outage Seismic stability of these underground complexes is required to be seriously addressed. The underground cavern complex of the Baihetan hydropower plant in Yunnan Province, China, is currently the world's largest underground rock cavern group under construction. Aseismic issues of the underground cavern complex are discussed in this paper. On the basis of this research, seismic variables of the Baihetan project are firstly determined for Design Basis Earthquake and Safety Evaluation Earthquake. The artificial seismic motions for the dynamic analyses are simulated. Two alternative scheme of layout plans of the underground cavern complex are studied, with full 3-D elasto-plastic dynamic response analyses based on the parameters given by the cyclic dynamic loading tests with medium strain rate. The seismic response of seismic displacement and failure zones of each scheme are studied, respectively. A performance verification of the supporting measures during earthquake is also discussed. The results indicate that in spite a wider powerhouse cavern, the scheme "A" which involves a gallery-shaped surge chamber is more stabilized during an earthquake than the scheme "B" whom with barrel-shaped surge chambers. The underground cavern complex with scheme "B" is relatively stable under Design Basis Earthquake and Safety Evaluation Earthquake, despite a minor damage of the surrounding rock. And the implementation of the proposed support system may further guaranteed a safe state of the underground cavern complex in earthquake events.
引用
收藏
页码:1753 / 1761
页数:9
相关论文
共 50 条
  • [1] Seismic response and stability of underground rock caverns: a case study of Baihetan underground cavern complex
    Cui, Zhen
    Sheng, Qian
    Leng, Xianlun
    Chen, Jian
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2016, 39 (01) : 26 - 39
  • [2] Probabilistic evaluation method for the stability of large underground cavern considering the uncertainty of rock mass mechanical parameters: A case study of Baihetan underground powerhouse project
    Liu, Guofeng
    Zhou, Chi
    Feng, Kun
    Jiang, Quan
    Li, Shengfeng
    Bao, Han
    Li, Ang
    [J]. ENGINEERING GEOLOGY, 2024, 340
  • [3] A case study on the stability of a big underground powerhouse cavern cut by an interlayer shear zone in the China Baihetan hydropower plant
    Zou, Lifang
    Meng, Guotao
    Wu, Jiayao
    Fu, Wei
    Chu, Weijiang
    Xu, Weiya
    [J]. DEEP UNDERGROUND SCIENCE AND ENGINEERING, 2024,
  • [4] Stability Analysis of Surrounding Rock Mass of Underground Powerhouse Cavern
    He, Xiaogang
    Dai, Feng
    Xu, Nuwen
    Sha, Chun
    [J]. CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 878 - +
  • [5] Vertical displacement estimation in roof and floor of an underground powerhouse cavern
    Rezaei, Mohammad
    Rajabi, Morteza
    [J]. ENGINEERING FAILURE ANALYSIS, 2018, 90 : 290 - 309
  • [6] Dynamic Stability Evaluation of Underground Powerhouse Cavern Using Microseismic Monitoring
    Kumar, Vikalp
    Jha, Prakash Chandra
    Singh, Nagendra Pratap
    Cherukuri, Sivakumar
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (03) : 1795 - 1815
  • [7] In situ experimental investigation of basalt spalling in a large underground powerhouse cavern
    Jiang, Quan
    Feng, Xia-ting
    Fan, Yilin
    Fan, Qixiang
    Liu, Guofeng
    Pei, Shufeng
    Duan, Shuqian
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 68 : 82 - 94
  • [8] Dynamic Stability Evaluation of Underground Powerhouse Cavern Using Microseismic Monitoring
    Vikalp Kumar
    Prakash Chandra Jha
    Nagendra Pratap Singh
    Sivakumar Cherukuri
    [J]. Geotechnical and Geological Engineering, 2021, 39 : 1795 - 1815
  • [9] Study on cumulative damage mechanisms of Baihetan large underground powerhouse under blasting loads
    Zhao, Jinshuai
    Chen, Bingrui
    Jiang, Quan
    Hao, Xianjie
    Duan, Shuqian
    Liu, Guofeng
    Pei, Shufeng
    Yang, Guangdong
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2022, 41 (05): : 916 - 925
  • [10] Research on the regional stress field of underground powerhouse at the right bank of Baihetan hydropower station
    Zhao, Qing
    Leng, Xianlun
    He, Xiang
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1042 - +