LIFETIME EVALUATION OF HYDROPOWER PLANTS MECHANICAL EQUIPMENT FOR PREDICTIVE MAINTENANCE

被引:0
|
作者
Dragoi, Constantin [1 ]
Piraianu, Vlad Florin [1 ]
Husar, Calin [2 ]
Grovu, Mihail [2 ]
机构
[1] Univ Politehn Bucuresti, Bucharest, Romania
[2] Siemens Ind Software SRL, Brasov, Romania
关键词
fatigue; lifetime; hydroelectric power plant; finite element analysis;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Hydroelectric power plants (HPP) are one of the most used form of energy generation plants across the world and their development assures also the developing of other industries and economic sectors. The dams of a HPP are playing a major role in preventing floods and multiple use of the water (water supply, agriculture, etc). HPPs are playing a crucial role in the supply of grid system services while providing frequency and voltage balancing services. Their capabilities to adjust the generated power and operate at partial loads, to accumulate the hydraulic energy in reservoirs and to deliver energy with fast response time, recommends them to be actively involved in the grid services required to assure the continuity and safety in operation. However, not every HPP is most adequate to provide all type of energy balancing services due to their fundamental design. A derivation HPP designed with a higher value of the installed coefficient, will assure operation at peak region of the energy demand curve generating few hours per day and is mostly used to provide grid services rather than a run-of-river HPP. The main services provided are voltage and frequency regulation but also reactive power balancing which means that the generator unit is operating in compensatory regime. This paper presents the results obtained by researchers during a complete fatigue analysis study of the mechanical elements of a HPP equipped with a 55 MW Francis turbine. The analysis was done in order to determine the remaining lifetime of the main equipment, in order to develop the maintenance program if case.
引用
收藏
页码:465 / 472
页数:8
相关论文
共 50 条
  • [1] Condition monitoring and predictive maintenance methodologies for hydropower plants equipment
    Betti, Alessandro
    Crisostomi, Emanuele
    Paolinelli, Gianluca
    Piazzi, Antonio
    Ruffini, Fabrizio
    Tucci, Mauro
    [J]. RENEWABLE ENERGY, 2021, 171 (171) : 246 - 253
  • [2] Evaluating the lifetime of hydro-mechanical equipment for low head hydropower plants
    DrǍgoi, Constantin
    PîrǍianu, Vlad Florin
    PîrǍianu, Constantin
    [J]. UPB Scientific Bulletin, Series D: Mechanical Engineering, 2012, 74 (01): : 73 - 82
  • [3] PREDICTIVE MAINTENANCE: A VIABLE MAINTENANCE OPTION FOR MACHINES/EQUIPMENT/PLANTS IN MINING AND MINERAL PROCESSING
    Dayo-Olupona, O.
    Genc, B.
    Bada, S.
    Celik, T.
    [J]. Proceedings of the 27th International Mining Congress and Exhibition of Turkey, IMCET 2022, 2022, : 759 - 765
  • [4] A review on operation and maintenance of hydropower plants
    Kumar, Krishna
    Saini, R. P.
    [J]. SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2022, 49
  • [5] Operation and Maintenance of Hydropower Plants in UK
    Funke, Hans-Christoph
    Edwards, Glyn
    [J]. WASSERWIRTSCHAFT, 2015, 105 (05) : 10 - 13
  • [6] Maintenance Concepts and Maintenance of Automation Systems in Hydropower Plants
    Debor, Joachim
    [J]. WASSERWIRTSCHAFT, 2015, 105 (05) : 19 - 22
  • [7] Reliability and check replacement policy of mechanical equipment under predictive maintenance
    Department of Mathematics and Physics, Shijiazhuang Railway Institute, Shijiazhuang 050043, China
    不详
    不详
    [J]. Jixie Gongcheng Xuebao, 2006, 3 (30-35):
  • [8] MAINTENANCE OF MECHANICAL EQUIPMENT
    SZYMANSKI, JR
    [J]. SEWAGE AND INDUSTRIAL WASTES, 1952, 24 (01): : 103 - 104
  • [9] Equipment for Predictive Maintenance in Hydrogenerators
    Ribeiro, L. C.
    Bonaldi, E. L.
    de Oliveira, L. E. L.
    Borges da Silva, L. E.
    Salomon, C. P.
    Santana, W. C.
    Borges da Silva, J. G.
    Lambert-Torres, G.
    [J]. 2ND AASRI CONFERENCE ON POWER AND ENERGY SYSTEMS (PES2013), 2014, 7 : 75 - 80
  • [10] PREDICTIVE MAINTENANCE IN EQUIPMENT TROUBLESHOOTING
    Cimpan, Marinel
    Arghir, Mariana
    [J]. ACTA TECHNICA NAPOCENSIS SERIES-APPLIED MATHEMATICS MECHANICS AND ENGINEERING, 2014, 57 (02): : 231 - 234