Developing a Rating Score for Out-of-Sequence Construction

被引:14
|
作者
Abotaleb, Ibrahim S. [1 ,2 ,3 ]
El-adaway, Islam H. [4 ,5 ]
Ibrahim, Michael W. [6 ,7 ]
Hanna, Awad S. [8 ]
Russell, Jeffrey S. [9 ]
机构
[1] Amer Univ Cairo, Dept Construct Engn, AUC Ave,SSE Bldg,Room 1152,POB 74, New Cairo 11835, Egypt
[2] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[3] Univ Tennessee, Dept Civil & Environm Engn, Knoxville, TN 37996 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO 65409 USA
[6] Calif State Univ Los Angeles, Dept Civil Engn, Construct & Engn Management, E&T A-215,5151 State Univ Dr, Los Angeles, CA 90032 USA
[7] Univ Wisconsin, Dept Civil & Environm Engn, 2256 Engn Hall,1415 Engn Dr, Madison, WI 53706 USA
[8] Univ Wisconsin, Dept Civil & Environm Engn, Construct Engn & Management Program, 2320 Engn Hall,1415 Engn Dr, Madison, WI 53706 USA
[9] Univ Wisconsin, Civil & Environm Engn, 21 North Pk St,7th Floor, Madison, WI 53715 USA
关键词
Changes; Out of sequence; Productivity; Cost; Schedule; Causes; Rating; Decision support tool; Planning; IMPACT; PRODUCTIVITY; MODEL; FLOW;
D O I
10.1061/(ASCE)ME.1943-5479.0000765
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Out-of-sequence (OOS) construction takes place when an activity or series of activities is not performed according to baseline planned logical productive sequencing. A previous expert-based study by the authors-which has already been published-was the first to provide an industry-wide assessment of OOS work that identified 88 causes of OOS work and quantified them in terms of likelihood of occurrence, relative impact, and risk rating. This paper moves forward to create OOS risk tiers and OOS rating score to measure a project's susceptibility to the risks of OOS in comparison with the industry averages. Series of statistical tests were used to determine the number of risk tiers, allocate the OOS causes to these risk tiers, and define cutoff scores for the different risk tiers. Ultimately, the developed OOS decision support tool was evaluated through expert reviews and direct application on 11 different construction projects. For best results, the associated stakeholders should use the proposed tool at the planning stage of their projects to identify the relevant risks and take the proper actions for prevention and mitigation. The research will help in minimizing OOS work in construction projects, which will yield enhanced productivity, reduced cost and incidence of schedule overruns, and a better overall contracting environment. (c) 2020 American Society of Civil Engineers.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Comprehensive Analysis of Factors Associated with Out-of-Sequence Construction
    Ibrahim, Michael W.
    Hanna, Awad S.
    Russell, Jeffrey S.
    Abotaleb, Ibrahim S.
    El-adaway, Islam H.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (04)
  • [2] OUT-OF-SEQUENCE THRUSTS
    MORLEY, CK
    TECTONICS, 1988, 7 (03) : 539 - 561
  • [3] Update with out-of-sequence measurements
    Zhou, Haomiao
    Deng, Zhihong
    Xi, Yuanqing
    Fu, Mengyin
    NEUROCOMPUTING, 2016, 214 : 121 - 125
  • [4] OUT-OF-SEQUENCE MINIRASTER.
    Anon
    IBM technical disclosure bulletin, 1985, 28 (01): : 3 - 5
  • [5] Selective fusion of out-of-sequence measurements
    Tasoulis, Dimitris K.
    Adams, Niall M.
    Hand, David J.
    INFORMATION FUSION, 2010, 11 (02) : 183 - 191
  • [6] Out-of-sequence allocation: It is useful, but is it ethical?
    Pullen, Lara C.
    AMERICAN JOURNAL OF TRANSPLANTATION, 2025, 25 (03) : 451 - 453
  • [7] Optimal update with out-of-sequence measurements
    Zhang, KS
    Li, XR
    Zhu, YM
    IEEE TRANSACTIONS ON SIGNAL PROCESSING, 2005, 53 (06) : 1992 - 2004
  • [8] Multirate filtering with out-of-sequence data
    Hong, L
    Cong, S
    Wicker, D
    SIGNAL PROCESSING, SENSOR FUSION, AND TARGET RECOGNITION XI, 2002, 4729 : 199 - 210
  • [9] IMM estimator with out-of-sequence measurements
    Bar-Shalom, Y
    Chen, HM
    IEEE TRANSACTIONS ON AEROSPACE AND ELECTRONIC SYSTEMS, 2005, 41 (01) : 90 - 98
  • [10] A unified out-of-sequence measurements filter
    Yu, AX
    Liang, DN
    Hu, WD
    Dong, Z
    2005 IEEE International Radar, Conference Record, 2005, : 453 - 458