A contingency view of time-based competition for manufacturers

被引:36
|
作者
Bozarth, C [1 ]
Chapman, S [1 ]
机构
[1] N CAROLINA STATE UNIV, RALEIGH, NC 27695 USA
关键词
competitive manufacturing; cycle time reduction; manufacturing; manufacturing strategy;
D O I
10.1108/01443579610119090
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The growing time-based competition (TBC) literature coincides with an increased emphasis on time in manufacturing organizations. In a 1993 survey, 93 per cent of US and European managers identified reliable delivery times as having above average importance, while overall delivery speed was cited by 88 per cent and 89 per cent, respectively. At the same time, 82 per cent of Japanese managers rated rapid new product introduction as having above average importance. Highlights potentially different sources of time-based advantages. The factors described above are linked by a common emphasis on time, but the driving strategies and tactics used to achieve them can differ or possibly conflict. Presents a framework of time-based competition for manufacturers. Demonstrates how differences between engineer-to-order, make-to-order, assembly-to-order and make-to-stock manufacturers result in the need to use different approaches to implement TBC.
引用
收藏
页码:56 / +
页数:1
相关论文
共 50 条
  • [1] TIME-BASED COMPETITION
    WRENNALL, W
    MANUFACTURING ENGINEERING, 1990, 105 (04): : 136 - 136
  • [2] Time-based competition is not enough
    Hout, TM
    RESEARCH-TECHNOLOGY MANAGEMENT, 1996, 39 (04) : 15 - 17
  • [3] TIME-BASED COMPETITION AND THE PRIVATIZATION OF SERVICES
    STENBACKA, R
    TOMBAK, MM
    JOURNAL OF INDUSTRIAL ECONOMICS, 1995, 43 (04): : 435 - 454
  • [4] Time-Based Competition with Benchmark Effects
    Yang, Liu
    de Vericourt, Francis
    Sun, Peng
    M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2014, 16 (01) : 119 - 132
  • [5] A model of mechanism in time-based competition
    Zhang, X
    Chen, RQ
    Hu, B
    MANAGEMENT SCIENCES AND GLOBAL STRATEGIES IN THE 21ST CENTURY, VOLS 1 AND 2, 2004, : 549 - 555
  • [6] Team building as a strategy for time-based competition
    Zawacki, RA
    Lackow, H
    INFORMATION SYSTEMS MANAGEMENT, 1998, 15 (03) : 36 - 39
  • [7] Team building as a strategy for time-based competition
    Inf. Syst. Manage., 3 (36-39):
  • [8] Implementing time-based manufacturing practices in pharmaceutical preparation manufacturers
    Brown, Steve
    Vondracek, Paul
    PRODUCTION PLANNING & CONTROL, 2013, 24 (01) : 28 - 46
  • [9] Exploring relational aspects of time-based competition
    Thomas, Rodney
    INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & LOGISTICS MANAGEMENT, 2008, 38 (07) : 540 - 550
  • [10] Time-based competition in medical technology innovation
    Kumar, A
    Wang, ZX
    Pradhan, S
    Montclair, U
    PROCEEDINGS OF THE TWENTY-SEVENTH ANNUAL MEETING OF THE WESTERN DECISION SCIENCES INSTITUTE, 1998, : 544 - 546