The APS septum magnet power supplies upgrade

被引:0
|
作者
Deriy, B [1 ]
Hillman, A [1 ]
Sprau, G [1 ]
Wang, J [1 ]
机构
[1] Argonne Natl Lab, Argonne, IL 60439 USA
关键词
D O I
暂无
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The higher requirements for beam injection stability at the APS storage ring (SR) demand improvement of pulsed power supplies for the septum magnets. The new specification for the current repeatibility is 1/2000. The upgrade will be performed in two stages. In the first stage we will implement a new voltage regulation circuit in the power supply with a new timing sequence that will provide better voltage regulation performance. A common design is made for all of the septum magnet power supplies (SMPSs) at the APS. The new regulation module has already been tested on both thin and thick SMPSs. The test shows that the achieved voltage regulation is much better than 1/2000. Combined with a current feedback loop, it can provide a shot-to-shot current repeatability better than 1/2000. The second phase of the upgrade will develop the current feedback loop and control algorithm. This paper will decribe the design and test results for the first phase only.
引用
收藏
页码:3795 / 3797
页数:3
相关论文
共 50 条
  • [1] Ramp tuning of the APS booster synchrotron magnet power supplies
    Milton, SV
    Carwardine, JA
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 2708 - 2710
  • [2] Analysis of the electrical noise from the APS kicker magnet power supplies
    Carwardine, JA
    Wang, J
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 1242 - 1244
  • [3] Control upgrade for the TCV coils power supplies
    de la Fuente, D. Velasco
    Cherix, N.
    Fasel, D.
    Dubray, J.
    Orsinger, J.
    Siravo, U.
    Tran, Y. K.
    FUSION ENGINEERING AND DESIGN, 2023, 191
  • [4] Improvements of the APS storage ring klystron power supplies
    Cours, A
    Pile, G
    CONFERENCE RECORD OF THE 1998 TWENTY-THIRD INTERNATIONAL POWER MODULATOR SYMPOSIUM, 1998, : 100 - 100
  • [5] Performance of the ramping power supplies for the APS booster synchrotron
    Carwardine, JA
    Milton, SV
    McGhee, DG
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 1967 - 1969
  • [6] Precision septum-like dipole magnet for the HERA luminosity upgrade
    Anderberg, B
    Danielsson, J
    Beeckman, W
    Holler, Y
    Sinram, K
    Vieweg, M
    Willeke, F
    Woebke, G
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2002, 12 (01) : 317 - 320
  • [7] LARGE DC MAGNET POWER SUPPLIES AT SLAC
    BERNDT, MM
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1969, NS16 (3P1) : 711 - &
  • [8] LARGE DC MAGNET POWER SUPPLIES AT SLAC
    BERNDT, MM
    BULLETIN OF THE AMERICAN PHYSICAL SOCIETY, 1969, 14 (02): : 228 - &
  • [9] Installation and testing of SNS magnet power supplies
    Rust, KR
    Barnett, WE
    Cutler, RI
    Weaver, JT
    Lambiase, R
    Sandberg, J
    Dewan, S
    Holmes, R
    Wong, S
    Zeng, JQ
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 3998 - 4000
  • [10] The AGS main magnet power supply upgrade
    Sandberg, JN
    Casella, R
    Geller, J
    Marneris, I
    Soukas, A
    Schumburg, N
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 1964 - 1966