共 8 条
- [4] METHOD ABC FOR PLANNING OF MANUFACTURING PROCESS AND ITS ANALYSIS FROM POINT OF VIEW OF VALUE ENGINEERING [J]. MECHANIK MIESIECZNIK NAUKOWO-TECHNICZNY, 1977, 50 (01): : 25 - 26
- [6] EFFECTIVENESS OF USING NATURAL GAS IN 3-UPTAKE OPEN-HEARTH FURNACES FROM THERMAL ENGINEERING POINT OF VIEW [J]. STAL IN ENGLISH-USSR, 1966, (04): : 266 - &
- [8] Tracer, the engineering arm of Tyco Thermal Controls, has recently provided Nigeria LNG Ltd (NLNG) with a complete electric heat-tracing system for temperature maintenance on Bonny Train 6 - an additional process train being installed at the liquefied natural gas (LNG) plant at Finima, Bonny Island, Rivers State, Nigeria. It had also previously designed and supplied the heat-tracing systems for Bonny Trains 1-5. [J]. INTERNATIONAL GAS ENGINEERING AND MANAGEMENT, 2006, 46 (03): : 26 - 26