Analysis of bonded link slabs in precast, prestressed concrete girder bridges

被引:0
|
作者
Gergess, Antoine N. [1 ]
机构
[1] Univ Balamand, Civil Engn, Balamand, Lebanon
来源
PCI JOURNAL | 2019年 / 64卷 / 03期
关键词
AASHTO girder; bond; girder; link slab; load; parametric study; stiffness; DESIGN;
D O I
10.15554/PCIJ64.3-03
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Link slabs provide continuity in the deck slab over the intermediate supports of multiple-span bridges where precast, prestressed concrete girders are used. Current practice recommends debonding the link slab from the girders' ends to reduce its stiffness. Steel reinforcement is consequently provided to satisfy the dead- and live-load criteria. A survey of bridges in the United States indicated that full-depth cracks still develop in the link slab and some practices are placing the link slab without debonding. Although design procedures for debonded link slabs are currently available, data related to bonded link slabs is scarce. This paper investigates the structural behavior of bonded link slabs due to dead and live loads. It examines the contribution of the stillness of the link slab on redistribution of shear and moments. Closed-form solutions were derived for a three-span symmetrical case and a parametric study conducted based on standard American Association of State Highway and Transportation girders commonly used in the medium-span-length range. It was shown that the link slab parameters, if optimized, can strengthen the connection in the continuity zone to resist the induced loads without affecting its resisting capacity.
引用
收藏
页码:47 / 65
页数:19
相关论文
共 50 条
  • [1] Transverse design of adjacent precast prestressed concrete box girder bridges
    ElRemaily, A
    Tadros, MK
    Yamane, T
    Krause, G
    [J]. PCI JOURNAL, 1996, 41 (04): : 96 - 113
  • [2] Resolving restraint moments: Designing for continuity in precast prestressed concrete girder bridges
    McDonagh, MD
    Hinkley, KB
    [J]. PCI JOURNAL, 2003, 48 (04): : 104 - +
  • [3] Introduction of seismic-resistant precast/prestressed concrete girder bridges in California
    LoBuono, JP
    Abdel-Karim, AM
    [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 273 - 282
  • [4] Introduction of seismic-resistant precast/prestressed concrete girder bridges in California
    LoBuono, JP
    Abdel-Karim, AM
    [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 273 - 282
  • [5] Evaluation of common design policies for precast, prestressed concrete I-girder bridges
    Institute of Concrete Science and Technology, Universitat Politècnica de València, Valencia, Spain
    [J]. PCI J, 4 (126-127):
  • [6] LONG-SPAN PRECAST PRESTRESSED GIRDER BRIDGES
    LIBBY, JR
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1971, 16 (04): : 80 - &
  • [7] Parametric study on precast prestressed concrete double-tee girder for rural bridges
    Dinh Hung Nguyen
    Hong Nghiep Vu
    Thac Quang Nguyen
    [J]. COMPUTERS AND CONCRETE, 2022, 29 (03): : 161 - 168
  • [8] Evaluation of common design policies for precast, prestressed concrete I-girder bridges
    Marti-Vargas, Jose R.
    [J]. PCI JOURNAL, 2014, : 126 - 127
  • [9] Evaluation of common design policies for precast, prestressed concrete I-girder bridges
    Brice, Richard
    Seguirant, Stephen J.
    Khaleghi, Bijan
    [J]. PCI JOURNAL, 2013, : 68 - 80
  • [10] Design implications of increased live loads on continuous precast, prestressed concrete girder bridges
    [J]. Gergess, A.N., 2013, Precast/Prestressed Concrete Institute (58):