共 50 条
- [2] CONSTRUCTIONAL PROGRAM FOR HUNGARIAN NUCLEAR-POWER PLANT ENERGIA ES ATOMTECHNIKA, 1975, 28 (06): : 271 - 275
- [3] INSERTION OF ELECTRIC ENERGY GENERATION BY NUCLEAR-POWER PLANT INTO THE HUNGARIAN ELECTRIC ENERGY SYSTEM ENERGIA ES ATOMTECHNIKA, 1984, 37 (02): : 59 - 66
- [4] MMPI NORMATIVE DATA FOR NUCLEAR-POWER PLANT PERSONNEL SCREENING TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 47 : 167 - 169
- [5] Remote disassembly of a nuclear power plant - The case of the Niederaichbach nuclear power plant ATW-INTERNATIONALE ZEITSCHRIFT FUR KERNENERGIE, 1995, 40 (10): : 615 - 618
- [7] Research on the Screening Method of Predictive Maintenance Monitoring Equipment in Nuclear Power Plant 2020 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-BESANCON 2020), 2020, : 128 - 131
- [8] Investigation on Screening and Ranking of Life Cycle Management Objects in Nuclear Power Plant Hedongli Gongcheng/Nuclear Power Engineering, 2022, 43 (04): : 201 - 205
- [9] HUNGARIAN NUCLEAR-POWER STATION AND ENERGY PROBLEM NEW HUNGARIAN QUARTERLY, 1978, 19 (71): : 114 - 119
- [10] Reliability research of nuclear power plant operators through nuclear power plant simulator Hedongli Gongcheng/Nuclear Power Engineering, 2000, 21 (01): : 68 - 71