共 50 条
- [1] A Sequential Optimization Model of Cut-off Grade and Project/Location Selection in Open Pit Mining [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2019, 18 (03): : 369 - 382
- [3] Optimization of the cut-off grade for underground polymetallic mines [J]. GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2019, 35 (01): : 25 - 42
- [5] Optimization of cut-off grade and its application for polymetallic deposits [J]. Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2010, 32 (09): : 1107 - 1112
- [9] A Cut-Off Grade Optimization Model in the Open Pit Mining Considering Reclamation and Valuable Waste Materials [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 45 - 49