Cladding stress during extended storage of high burnup spent nuclear fuel

被引:26
|
作者
Raynaud, Patrick A. C. [1 ]
Einziger, Robert E. [1 ]
机构
[1] US Nucl Regulatory Commiss, Washington, DC 20555 USA
关键词
DELAYED HYDRIDE CRACKING; DRY STORAGE; EVOLUTION; HELIUM; UO2;
D O I
10.1016/j.jnucmat.2015.05.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In an effort to assess the potential for low temperature creep and delayed hydride cracking failures in high burnup spent fuel cladding during extended dry storage, the U.S. NRC analytical fuel performance tools were used to predict cladding stress during a 300 year dry storage period for UO2 fuel burned up to 65 GWd/MTU. Fuel swelling correlations were developed and used along with decay gas production and release fractions to produce circumferential average cladding stress predictions with the FRAPCON-3.5 fuel performance code. The resulting stresses did not result in cladding creep failures. The maximum creep strains accumulated were on the order of 0.54-1.04%, but creep failures are not expected below at least 2% strain. The potential for delayed hydride cracking was assessed by calculating the critical flaw size required to trigger this failure mechanism. The critical flaw size far exceeded any realistic flaw expected in spent fuel at end of reactor life. Published by Elsevier B.V.
引用
收藏
页码:304 / 312
页数:9
相关论文
共 50 条
  • [1] Metallographic examinations and hydrogen measurements of high-burnup spent nuclear fuel cladding
    Ayanoglu, Muhammet
    Montgomery, Rose
    Harp, Jason
    Sasikumar, Yadukrishnan
    JOURNAL OF NUCLEAR MATERIALS, 2024, 589
  • [2] US Nuclear Regulatory Commission acceptance criteria and cladding considerations for the storage and transportation of high burnup and damaged spent fuel
    Gruss, KA
    Hornseth, G
    Hodges, MW
    STORAGE OF SPENT FUEL FROM POWER REACTORS, 2003, 20 : 229 - 239
  • [3] CFD analysis of spent fuel dry cask storage system for High burnup nuclear fuel
    Fulpagare, Yogesh
    Yao, Tao
    Li, Chao-Jen
    Wang, Chi-Chuan
    PROGRESS IN NUCLEAR ENERGY, 2023, 161
  • [4] Determination of the Burnup of Spent Nuclear Fuel during Reloading
    S. G. Oleinik
    M. V. Maksimov
    O. V. Maslov
    Atomic Energy, 2002, 92 : 296 - 300
  • [5] Determination of the burnup of spent nuclear fuel during reloading
    Oleinik, SG
    Maksimov, MV
    Maslov, OV
    ATOMIC ENERGY, 2002, 92 (04) : 296 - 300
  • [6] Spent LWR fuel dry storage in large transport and storage casks after extended burnup
    Spilker, H
    Peehs, M
    Dyck, HP
    Kaspar, G
    Nissen, K
    JOURNAL OF NUCLEAR MATERIALS, 1997, 250 (01) : 63 - 74
  • [7] ASSESSMENT OF INTERIM STORAGE OF SPENT HIGH-BURNUP LWR FUEL
    JOHNSON, AB
    BAILEY, WJ
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 40 : 150 - 152
  • [8] Analysis of high burnup spent nuclear fuel by ICP-MS
    S. F. Wolf
    D. L. Bowers
    J. C. Cunnane
    Journal of Radioanalytical and Nuclear Chemistry, 2005, 263 : 581 - 586
  • [9] Analysis of high burnup spent nuclear fuel by ICP-MS
    Wolf, SF
    Bowers, DL
    Cunnane, JC
    JOURNAL OF RADIOANALYTICAL AND NUCLEAR CHEMISTRY, 2005, 263 (03) : 581 - 586
  • [10] On the corrosion of spent fuel aluminium cladding during wet storage
    Ciuculescu, Cristina
    Dobre, Tanase
    REVISTA DE CHIMIE, 2008, 59 (02): : 178 - 180