Research on Effect of Passenger Behavior to Transfer Demand of Comprehensive Transport Hub: A Case of High-speed Railway Station

被引:0
|
作者
Shen, Ruiguang [1 ]
Pei, Yulong [1 ]
机构
[1] Harbin Inst Technol, Sch Traff Sci & Engn, Harbin 150090, Peoples R China
关键词
Urban Comprehensive Passenger Transport Hub; Passenger Transport Behavior; Transport Demand; Multi-objective Decision Function; TIME;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Although traffic development brings convenience to citizen, problems such as parking, traffic transferring, caused by passenger transport hub have aroused extensive attention from society. Based on teasing transfer demand hierarchy and decision choice, concept of expected utility is introduced to uncover logical relationship among transport hub, influence factors, and parking demand. Data about passenger individual characteristics, transfer desire related with hub, are surveyed and collected to analyze and confirm the key influence factors on the basis of urban comprehensive passenger transport hub oriented high-speed rail, for setting up the relationship between transfer demand at synthesis passenger hub and its impact factors, which is used to analyze transfer demand at the comprehensive passenger transport hub oriented high-speed rail.
引用
收藏
页码:456 / 459
页数:4
相关论文
共 50 条
  • [1] Timetable optimization of high-speed railway hub based on passenger transfer
    Chen, Tao
    Lv, Hongxia
    Sun, Yichen
    Wang, Xiaoyi
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 38 (05) : 5743 - 5752
  • [2] A Parking Demand Forecasting Method for Urban Comprehensive Passenger Transport Hub Oriented High-speed Rail
    Shen, Ruiguang
    Pei, Yulong
    [J]. NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 828 - 831
  • [3] Passenger Flow Detection of Video Surveillance: A Case Study of High-Speed Railway Transport Hub in China
    Xie Zhengyu
    Jia Limin
    Qin Yong
    Wang Li
    [J]. ELEKTRONIKA IR ELEKTROTECHNIKA, 2015, 21 (01) : 48 - 53
  • [4] Research and application of the reforming scheme of the High-speed Railway existing passenger station
    Han Li
    Liu Hongbin
    Xie Chunpu
    [J]. SUSTAINABLE DEVELOPMENT AND ENVIRONMENT II, PTS 1 AND 2, 2013, 409-410 : 509 - 513
  • [5] Estimation Passenger Transfer Demand Multimodal Split in a High-Speed Railway Hub Based on Multi-Source Data Fusion
    Ma, Xiaolei
    Liu, Bing
    Yao, Liliang
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2022, 50 (03): : 309 - 319
  • [6] A multi-agent simulation based train platforming research for facilitating passenger transfer in a high-speed railway station
    Zhang, Hongxiang
    Guo, Miao
    Hu, Liuyang
    Lu, Gongyuan
    [J]. SIMULATION MODELLING PRACTICE AND THEORY, 2024, 130
  • [7] Analysis and Optimization of Passenger Flowlines at Zhongchuan High-Speed Railway Station
    Wang, Hualan
    Wang, Baoli
    Xu, Jiaying
    Hu, Zunjie
    [J]. MODELLING AND SIMULATION IN ENGINEERING, 2018, 2018
  • [8] Prediction of Short-term Passenger Flow of High-speed Railway Integrated Passenger Hub under Station-city Integration
    Zhou, Langya
    Wang, Yile
    Xie, Yuchen
    Yang, Jing
    Gong, Weiwei
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (04): : 1 - 7
  • [9] The Intelligent Brain of the Passenger Station for China Railway High-Speed (CRH)
    Zhang, Chunjia
    Shi, Tianyun
    Yang, Jiandong
    Lv, Xiaojun
    [J]. PROCEEDINGS OF THE 38TH CHINESE CONTROL CONFERENCE (CCC), 2019, : 3733 - 3737
  • [10] A Multilevel Fuzzy Comprehensive Evaluation Model for Operation Safety of the Large High-Speed Railway Passenger Station
    Huang Zhiyuan
    Xu Ruihua
    Zhou Feng
    [J]. 2017 4TH INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS), 2017, : 844 - 851