Reliability, availability and maintainability analysis of a cement plant: a case study

被引:22
|
作者
Choudhary, Devendra [1 ]
Tripathi, Mayank [1 ]
Shankar, Ravi [2 ]
机构
[1] Govt Engn Coll Ajmer, Ajmer, India
[2] Indian Inst Technol Delhi, New Delhi, India
关键词
Reliability; Availability; India; Cement plant; Maintainability; MAINTENANCE; SYSTEM; OEE;
D O I
10.1108/IJQRM-10-2017-0215
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The demand of cement in India is expected to increase rapidly as the government has been giving immense boost to various housing facilities, infrastructure projects, road networks and railway corridors. One of the ways to meet this rise in the demand of cement is to increase the capacity utilization of the existing cement plants by improving their availability. The availability of a cement plant can be improved by avoiding failures and reducing maintenance time through reliability, availability and maintainability (RAM) analysis of its subsystems. The paper aims to discuss this issue. Design/methodology/approach The data related to time between failure (TBF) and time to repair (TTR) of all the critical subsystems of a cement plant were collected over a period of two years for carrying out RAM analysis. Trend test and serial correlation test were performed on TBF and TTR data to verify whether these data are independent and identically distributed or not. Afterwards, the authors use EasyFit 5.6 professional software to find best-fit distribution of TBF and TTR data and their parameters. The effectiveness of a preventive maintenance policy was evaluated by simulating the real and proposed systems. Findings The results of the analysis show that the raw mill and the coal mill are critical subsystems of a cement plant from a reliability point of view, whereas the kiln is a critical subsystem from an availability point of view. The analysis shows that the repair time of the cement mill should be reduced for improving the availability of the cement plant. The RAM analysis showed that the capacity of the case study company is 17 percent underutilized due to maintenance-related problems and 15 percent underutilized because of management-related problems. Practical implications - The study exhibits the usage of RAM analysis in deciding preventive maintenance programs of several cement plant subsystems. Thus, it would serve as a reference for reliability and maintenance managers in deciding maintenance strategies of cement plants as well as in improving their capacity utilization. Originality/value - The study exhibits the usage of RAM analysis in deciding preventive maintenance programs of several cement plant subsystems. Even more, using a simulation study, the authors show that preventive maintenance of the cement plant beyond a certain level can be disadvantageous as it leads to an increase in downtime and decrease in availability.
引用
收藏
页码:298 / 313
页数:16
相关论文
共 50 条
  • [1] Reliability, Availability and Maintainability Analysis for Transportation Vehicles-A Case Study in APSRTC
    Govindarajulu, E.
    Rakesh, S. Sai
    [J]. ADVANCES IN MATERIALS AND MANUFACTURING ENGINEERING, ICAMME 2019, 2020, : 457 - 462
  • [2] A Critical Investigation on the Reliability, Availability, and Maintainability of EPB Machines: A Case Study
    Koohsari, Ali
    Kalatehjari, Roohollah
    Moosazadeh, Sayfoddin
    Mohsen Hajihassani
    Van, Bao
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (21):
  • [3] Reliability, availability and maintainability study for failure analysis in series capacitor bank
    Arias Velasquez, Ricardo Manuel
    Mejia Lara, Jennifer Vanessa
    [J]. ENGINEERING FAILURE ANALYSIS, 2018, 86 : 158 - 167
  • [4] THE INFLUENCE OF MAINTENANCE SYSTEM RELIABILITY AND MAINTAINABILITY CHARACTERISTICS ON PLANT AVAILABILITY
    PRINCE, BE
    HAIRE, MJ
    [J]. PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1991, (SYM): : 615 - 623
  • [5] Reliability, availability, maintainability, and dependability analysis of photovoltaic systems
    Maihulla A.S.
    Yusuf I.
    [J]. Life Cycle Reliability and Safety Engineering, 2022, 11 (1) : 19 - 26
  • [6] Reliability, availability, and maintainability analysis of the propulsion system of a fleet
    Bayraktar, Murat
    Nuran, Mustafa
    [J]. SCIENTIFIC JOURNALS OF THE MARITIME UNIVERSITY OF SZCZECIN-ZESZYTY NAUKOWE AKADEMII MORSKIEJ W SZCZECINIE, 2022, 70 (142): : 63 - 70
  • [7] Metro Door System Reliability, Availability and Maintainability Analysis
    Hoh, Hsin Jen
    Wang, Jinlong
    Pang, John Hock Lye
    Siew, Justin Wei Jin
    Lau, Peter Weng Kiong
    [J]. 2018 INTERNATIONAL CONFERENCE ON INTELLIGENT RAIL TRANSPORTATION (ICIRT), 2018,
  • [8] Process Plant Upgradation Using Reliability, Availability, and Maintainability (RAM) Criteria
    Bai, Dongqiao
    Yang, Qi
    Zhang, Jian
    Li, Shouzhi
    [J]. INTERNATIONAL JOURNAL OF OPTICS, 2022, 2022
  • [9] Reliability, Availability and Maintainability Analysis to Improve the Operational Performance of Soft Water Treatment and Supply Plant
    Kumar, Ashish
    Singh, Rajbir
    Saini, Monika
    Dahiya, Ombir
    [J]. Journal of Engineering Science and Technology Review, 2020, 13 (05) : 189 - 192
  • [10] Reliability, availability and maintainability (RAM) investigation of Load Haul Dumpers (LHDs): a case study
    Balaraju Jakkula
    Govinda Raj Mandela
    Suryanarayana Murthy Chivukula
    [J]. International Journal of System Assurance Engineering and Management, 2022, 13 : 504 - 515