Identification of Early-Age Cracking in Concrete Bridge Decks

被引:13
|
作者
Subramaniam, Kolluru V. L. [1 ]
机构
[1] Indian Inst Technol Hyderabad, Dept Civil Engn, Hyderabad 502205, TS, India
关键词
Cracking; Early age; High performance; Bridge deck; Concrete; Restrained shrinkage; Thermal;
D O I
10.1061/(ASCE)CF.1943-5509.0000915
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cracking in single-span concrete bridge decks was investigated. An assessment of the cracking as it relates to in situ concrete strength was performed. In cracked decks, concrete was of uniform quality and the compressive strength obtained from cores was in excess of the design strength. Evaluation of cores using an optical technique revealed that the cracks in the bridge decks formed at an early age, when the strength of the cementitious matrix is less than the strength of the coarse aggregate. Tests on mature concrete obtained from bridge decks indicate that the cementitious matrix is stronger than the coarse aggregate, resulting in aggregate fracture under tensile loading. Findings indicate that transverse cracking in the midspan portion of bridges with elastomeric bearings and longitudinal cracking at the supports in bridges with integral abutments result from restraint of early-age thermal movement of the bridge deck. The available evidence suggests that cracking in the bridge decks occurs in the first 48h after casting.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Limiting Early-Age Cracking in Concrete Bridge Decks
    ElSafty, Adel
    Abdel-Mohti, Ahmed
    Jackson, Mike
    Lasa, Ivan
    Paredes, Mario
    [J]. ADVANCES IN CIVIL ENGINEERING MATERIALS, 2013, 2 (01): : 379 - 399
  • [2] Thermal effects on early-age cracking potential of concrete bridge decks
    Bolander, J. E.
    Kim, K.
    Sasaki, K.
    [J]. COMPUTATIONAL MODELLING OF CONCRETE STRUCTURES, VOL 2, 2014, : 723 - 729
  • [3] Early-Age Cracking in High Performance Concrete Decks of a Curved Steel Girder Bridge
    Xia, Ye
    Nassif, Hani
    Su, Dan
    [J]. JOURNAL OF AEROSPACE ENGINEERING, 2017, 30 (02)
  • [4] Early age cracking of reinforced concrete bridge decks
    William, Gergis W.
    Shoukry, Samir N.
    Riad, Mourad Y.
    [J]. BRIDGE STRUCTURES, 2005, 1 (04) : 379 - 396
  • [5] Controlling early-age temperature variations in concrete bridge decks
    Bolander, J. E.
    Kim, K.
    [J]. LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 470 - 476
  • [6] Early-age cracking in reconstructed concrete bridge barrier walls
    Cusson, D
    Repette, WL
    [J]. ACI MATERIALS JOURNAL, 2000, 97 (04) : 438 - 446
  • [7] Super absorbing polymers as an internal curing agent for mitigation of early-age cracking of high-performance concrete bridge decks
    Craeye, Bart
    Geirnaert, Matthew
    De Schutter, Geert
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2011, 25 (01) : 1 - 13
  • [8] Advanced analysis of stresses for control of transverse cracking in early-age concrete decks of composite bridges
    Oh, B. H.
    Choi, S. C.
    [J]. MEASURING, MONITORING AND MODELING CONCRETE PROPERTIES, 2006, : 259 - +
  • [9] Early age cracking in high performance concrete decks of a curved steel girder bridge
    Xia, Y.
    Nassif, H.
    Su, D.
    Na, C.
    Lou, P.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 947 - 953
  • [10] Early-Age Cracking of Lightweight Mass Concrete
    Tankasala, Aravind
    Schindler, Anton K.
    [J]. ACI MATERIALS JOURNAL, 2020, 117 (01) : 223 - 232