共 50 条
- [1] Evaluation of biological removal efficiency in a UCT process treating municipal wastewater during start-up stage [J]. JOURNAL OF ENVIRONMENTAL BIOLOGY, 2013, 34 (02): : 459 - 464
- [5] Rapid start-up of CANON treating domestic wastewater and the community dynamics in MBR [J]. Li, D. (lidong2006@bjut.edu.cn), 1600, Harbin Institute of Technology (46): : 25 - 30
- [7] Granulation during start-up and operation of UASB reactors at 20°C treating municipal wastewater [J]. ADVANCES IN FILTRATION AND SEPARATION TECHNOLOGY, VOL 12, 1998: ADVANCING FILTRATION SOLUTIONS 98, 1998, : 360 - 367
- [8] Start-up of an Anaerobic Hybrid (UASB/Filter) Pilot Plant Treating Petrochemical Industrial Wastewater [J]. PROGRESS IN ENVIRONMENTAL SCIENCE AND TECHNOLOGY, VOL II, PTS A AND B, 2009, : 1133 - 1136
- [9] Effect of the start-up length on the biological nutrient removal process [J]. WATER POLLUTION IX, 2008, 111 : 521 - +
- [10] Removal Performance of Organic Matter of MBR and Hybrid MBBR-MBR Systems During Start-up and Stabilization Phases Treating Variable Salinity Urban Wastewater [J]. FRONTIERS IN WASTEWATER TREATMENT AND MODELLING, FICWTM 2017, 2017, 4 : 555 - 560