J-PARC commissioning results

被引:0
|
作者
Hasegawa, K [1 ]
机构
[1] JAERI, Naka, Ibaraki 3191195, Japan
关键词
D O I
暂无
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The J-PARC (Japan Proton Accelerator Research Complex) is a project to pursue frontier science and nuclear technology. It comprises a 400-MeV linac, a 3-GeV rapid-cycling synchrotron (RCS), a 50-GeV main ring synchrotron (MR) and experimental facilities. The buildings and conventional facilities will be completed in succession in the Japanese Fiscal Year 2005 and 2006, when the installation of the accelerator components will be actually started at Tokai site. A peak current of 30 mA was accelerated up to 20 MeV in the DTL beam commissioning at the KEK site and will be moved to Tokai. At the initial stage, the beam commissioning of the linac at an energy of 181 MeV will be started in September, 2006, followed by the RCS and MR beam commissioning. The recent results of the developments of accelerator components, the present construction status and the commissioning schedule are presented.
引用
收藏
页码:1413 / 1417
页数:5
相关论文
共 50 条
  • [1] Commissioning of the J-PARC linac
    Hasegawa, Kazuo
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2497 - 2501
  • [2] Recent results of the J-PARC linac beam commissioning
    Otani, Masashi
    JOURNAL OF THE KOREAN PHYSICAL SOCIETY, 2025,
  • [3] Commissioning of the J-PARC linac
    J-PARC Linac Commissioning Team, Japan Atomic Energy Agency, Tokai-mura, Ibaraki-ken, 319-1195, Japan
    Proc IEEE Part Accel Conf, (2619-2623):
  • [4] Σp scattering experiment at J-PARC - results of commissioning run -
    Miwa, K.
    Ahn, J. K.
    Akazawa, Y.
    Aramaki, T.
    Ashikaga, S.
    Callier, S.
    Chiga, N.
    Choi, S. W.
    Ekawa, H.
    Evtoukhovitch, P.
    Fujioka, N.
    Fujita, M.
    Hasegawa, S.
    Hayakawa, S.
    Honda, R.
    Hoshino, S.
    Hosomi, K.
    Ichikawa, M.
    Ichikawa, Y.
    Ieiri, M.
    Ikeda, M.
    Imai, K.
    Ishikawa, Y.
    Ishimoto, S.
    Jung, W. S.
    Kanauchi, H.
    Kanda, H.
    Kang, B. M.
    Kawai, H.
    Kim, S. H.
    Kobayashi, K.
    Koike, T.
    Matsuda, K.
    Matsumoto, Y.
    Nagatomi, R.
    Nakada, Y.
    Nakagawa, M.
    Nakamura, I.
    Nanamura, T.
    Naruki, M.
    Ozawa, S.
    Raux, L.
    Sakaguchi, A.
    Sako, H.
    Sato, S.
    Shiozaki, T.
    Shirotori, K.
    Suzuki, K.
    Suzuki, S.
    Tabata, M.
    13TH INTERNATIONAL CONFERENCE ON HYPERNUCLEAR AND STRANGE PARTICLE PHYSICS (HYP2018), 2019, 2130
  • [5] Beam commissioning and operation of the J-PARC linac
    Ikegami, Masanori
    PROGRESS OF THEORETICAL AND EXPERIMENTAL PHYSICS, 2012, 2012 (01):
  • [6] Beam dynamics and commissioning of the J-PARC linac
    Kondo, Y
    Ikegami, A
    Kobayashi, T
    Ohkawa, T
    Ueno, A
    HIGH INTENSITY AND HIGH BRIGHTNESS HADRON BEAMS, 2005, 773 : 79 - 83
  • [7] Beam commissioning for neutron and muon facility at J-PARC
    Meigo, Shin-ichiro
    Ohi, Motoki
    Kai, Tetsuya
    Ono, Takehiro
    Ikezaki, Kiyomi
    Haraguchi, Tetsuya
    Fujimori, Hiroshi
    Sakamoto, Shinichi
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2009, 600 (01): : 41 - 43
  • [8] Development of commissioning software system for J-PARC LINAC
    Sako, H.
    Shen, G.
    Ikeda, H.
    Allen, C. K.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 827 - +
  • [9] Beam commissioning and operation of the J-PARC main ring synchrotron
    Koseki, Tadashi
    Arakaki, Yoshitugu
    Chin, Yong Ho
    Hara, Keigo
    Hasegawa, Katsushi
    Hashimoto, Yoshinori
    Hori, Yoichiro
    Igarashi, Susumu
    Ishii, Koji
    Kamikubota, Norihiko
    Kimura, Takuro
    Koseki, Kunio
    Fan, Kuanjyun
    Kubota, Chikashi
    Kuniyasu, Yuu
    Kurimoto, Yoshinori
    Lee, Seishu
    Matsumoto, Hiroshi
    Molodozhentsev, Alexander
    Morita, Yuichi
    Murasugi, Shigeru
    Muto, Ryotaro
    Naito, Fujio
    Nakagawa, Hidetoshi
    Nakamura, Shu
    Niki, Kazuaki
    Ohmi, Kazuhito
    Ohmori, Chihiro
    Okada, Masashi
    Okamura, Katsuya
    Oogoe, Takao
    Ooya, Kazufumi
    Sato, Kenichi
    Sato, Yoichi
    Sato, Yoshihiro
    Satou, Kenichirou
    Shimamoto, Masayuki
    Shirakata, Masashi
    Someya, Hirohiko
    Sugimoto, Takuya
    Takano, Junpei
    Takeda, Yasuhiro
    Takiyama, Yoichi
    Tejima, Masaki
    Toda, Makoto
    Tomizawa, Masahito
    Toyama, Takeshi
    Uota, Masahiko
    Yamada, Shuei
    Yamamoto, Noboru
    PROGRESS OF THEORETICAL AND EXPERIMENTAL PHYSICS, 2012, 2012 (01):
  • [10] COMMISSIONING RUNS OF J-PARC E16 EXPERIMENT
    Ichikawa, M.
    Aoki, K.
    Arimizu, D.
    Ashikaga, S.
    Chang, W. -C.
    Chujo, T.
    Ebata, K.
    En'yo, H.
    Esumi, S.
    Hamagaki, H.
    Honda, R.
    Kajikawa, S.
    Kanno, K.
    Kimura, Y.
    Kiyomichi, A.
    Kondo, T. K.
    Kyan, S.
    Lin, C. -H.
    Lin, C. -S.
    Morino, Y.
    Murakami, H.
    Murakami, T. N.
    Muto, R.
    Nakai, W.
    Nakasuga, S.
    Naruki, M.
    Nonaka, T.
    Noumi, H.
    Ozawa, K.
    Sakaguchi, T.
    Sako, H.
    Sakuma, F.
    Sato, S.
    Sawada, S.
    Sekimoto, M.
    Shigaki, K.
    Shirotori, K.
    Sugimura, H.
    Takahashi, T. N.
    Takaura, Y.
    Tatsumi, R.
    Tsukui, K.
    Wang, P. -H.
    Yahiro, K.
    Yamaguchi, K. H.
    Yokkaich, S.
    ACTA PHYSICA POLONICA B PROCEEDINGS SUPPLEMENT, 2023, 16 (01)