Optimal spatial priority scheme of urban LID-BMPs under different investment periods

被引:31
|
作者
Hou, Jingwei [1 ,2 ]
Zhu, Moyan [1 ]
Wang, Yanjuan [1 ]
Sun, Shiqin [1 ]
机构
[1] Ningxia Univ, Coll Resources & Environm Sci, Yinchuan 750021, Ningxia, Peoples R China
[2] Ningxia China Arab Key Lab Resource Assessment &, Yinchuan 750021, Ningxia, Peoples R China
基金
中国国家自然科学基金;
关键词
Spatial construction sequence; Optimization; LID-BMPs; Adaptive differential evolution algorithm; Geographic information system; LOW IMPACT DEVELOPMENT; MULTIOBJECTIVE OPTIMIZATION; LAND-USE; STORMWATER MANAGEMENT; OPTIMAL SELECTION; SIMULATION; DESIGN; MODEL; INFRASTRUCTURE; PERFORMANCE;
D O I
10.1016/j.landurbplan.2020.103858
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
The optimal spatial layout of low impact development best management practices (LID-BMPs) can be used to inform LID-BMP construction to prioritize resources to achieve the highest comprehensive benefits. An objective decomposition algorithm is designed to decompose the control objectives of total rainwater runoff, peak discharge, pollution reduction and rainwater utilization for each pixel of a raster image. A type selection algorithm is then designed to optimize the types of LID-BMPs deployed in each pixel. The most suitable positions for the construction of LID-BMPs are identified using a topographic index model to determine spatial priority level of LID-BMP construction sequence. A multi-objective model, including the maximum average reduction ratios of runoff and pollution and minimum total cost, is constructed. An adaptive differential evolution algorithm (ADEA) is designed to solve the multi-objective optimization problem. The optimal grid-based priority scheme is obtained for high-resolution spatial planning. It is shown that the most suitable positions for implementing LID-BMPs are located in regions with negative soil moisture deficits. Optimal total cost and reduction ratios of runoff and pollution to construct LID-BMPs in Yinchuan, China are $49,463,516, and 0.46 and 0.38 in the first priority scheme; $50,920,496, and 0.74 and 0.62 in the second priority scheme; and $99,207,806, and 0.92 and 0.86 in the third priority scheme. The optimal spatial priority schemes of LID-BMPs obtained from the ADEA can maintain the maximum runoff and pollution controls under different investment periods.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] LID-BMPs planning for urban runoff control and the case study in China
    Jia, Haifeng
    Yao, Hairong
    Tang, Ying
    Yu, Shaw L.
    Field, Richard
    Tafuri, Anthony N.
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2015, 149 : 65 - 76
  • [2] Enhancing the Urban Resilience to Flood Risk Through a Decision Support Tool for the LID-BMPs Optimal Design
    Pugliese, Francesco
    Gerundo, Carlo
    De Paola, Francesco
    Caroppi, Gerardo
    Giugni, Maurizio
    [J]. WATER RESOURCES MANAGEMENT, 2022, 36 (14) : 5633 - 5654
  • [3] Planning of LID-BMPs for urban runoff control: The case of Beijing Olympic Village
    Jia, Haifeng
    Lu, Yuwen
    Yu, Shaw L.
    Chen, Yurong
    [J]. SEPARATION AND PURIFICATION TECHNOLOGY, 2012, 84 : 112 - 119
  • [4] Evaluating the impact of LID-BMPs on urban runoff reduction in an urban sub-catchment
    Arvand, Sedigheh
    Noroozi, Zahra Ganji
    Delghandi, Mahdi
    Alipour, Akbar
    [J]. URBAN WATER JOURNAL, 2023, 20 (05) : 604 - 615
  • [5] Enhancing the Urban Resilience to Flood Risk Through a Decision Support Tool for the LID-BMPs Optimal Design
    Francesco Pugliese
    Carlo Gerundo
    Francesco De Paola
    Gerardo Caroppi
    Maurizio Giugni
    [J]. Water Resources Management, 2022, 36 : 5633 - 5654
  • [6] Incorporating receiving waters responses into the framework of spatial optimization of LID-BMPs in plain river network region
    Leng, Linyuan
    Xu, Changqing
    Jia, Haifeng
    Jia, Qimeng
    [J]. WATER RESEARCH, 2022, 224
  • [7] Multi-objective decision-making for green infrastructure planning (LID-BMPs) in urban storm water management under uncertainty
    Raei, Ehsan
    Alizadeh, Mohammad Reza
    Nikoo, Mohammad Reza
    Adamowski, Jan
    [J]. JOURNAL OF HYDROLOGY, 2019, 579
  • [8] Assessment of LID-BMPs for Urban Runoff Control in Newly Developing Zones: the Case of Yanming Lake Residential District, China
    Liu, Min
    Zhou, Chuanbin
    Wang, Rusong
    [J]. DISASTER ADVANCES, 2013, 6 (09): : 3 - 10
  • [9] Hybrid SWMM and particle swarm optimization model for urban runoff water quality control by using green infrastructures (LID-BMPs)
    Taghizadeh, Soudabeh
    Khani, Salar
    Rajaee, Taher
    [J]. URBAN FORESTRY & URBAN GREENING, 2021, 60
  • [10] OPTIMAL INVESTMENT PROPORTIONS IN SENIOR SECURITIES AND EQUITIES UNDER ALTERNATIVE HOLDING PERIODS
    LEVY, H
    GUNTHORPE, D
    [J]. JOURNAL OF PORTFOLIO MANAGEMENT, 1993, 19 (04): : 30 - 36