共 50 条
- [1] Time to lane crossing calculation and characterization of its associated uncertainty [J]. ITS JOURNAL, 1996, 3 (02): : 85 - 98
- [2] Time to lane crossing calculation and characterization of its associated uncertainty [J]. ITS J, 2 (85):
- [3] Lane geometry perception and the characterization of its associated uncertainty [J]. JOURNAL OF DYNAMIC SYSTEMS MEASUREMENT AND CONTROL-TRANSACTIONS OF THE ASME, 1999, 121 (01): : 1 - 9
- [5] Time to line crossing and vehicle dynamics for lane departure avoidance [J]. ITSC 2004: 7TH INTERNATIONAL IEEE CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS, PROCEEDINGS, 2004, : 618 - 623
- [6] Pedestrian estimation of their crossing time on multi-lane roads [J]. ACCIDENT ANALYSIS AND PREVENTION, 2020, 143 (143):
- [8] Estimation method of time-to-line crossing for lane departure warning system [J]. Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 2014, 42 (03): : 59 - 65
- [10] Time-dependent approaches for the calculation of intersystem crossing rates [J]. JOURNAL OF CHEMICAL PHYSICS, 2011, 134 (15):