共 25 条
- [3] Modeling park-and-ride location choice of heterogeneous commuters [J]. Transportation, 2018, 45 : 71 - 87
- [4] Determining Optimal Lots for Developing Park-and-Ride Facilities: Case Study of Palm Beach County [J]. International Conference on Transportation and Development 2016: Projects and Practices for Prosperity, 2016, : 479 - 489
- [6] Optimal location of a park-and-ride system under capture rate and capacity constraints [J]. Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2017, 38 (02): : 207 - 214
- [7] TRIP GENERATION RATES FOR LIGHT RAIL TRANSIT PARK-AND-RIDE LOTS [J]. ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 1994, 64 (06): : 34 - 41
- [8] Demand forecasting model for park-and-ride lots in King County, Washington [J]. TRANSIT: BUS, PARATRANSIT, RURAL, INTERMODAL, RAIL, COMMUTER AND INTERCITY RAIL, LIGHT RAIL, 1998, (1623): : 80 - 87
- [9] On the Complexity of Computing Optimal Private Park-and-Ride Plans [J]. COMPUTATIONAL LOGISTICS, ICCL 2013, 2013, 8197 : 73 - 82
- [10] LOCATING AND SIZING PARK-RIDE LOTS WITH INTERACTIVE COMPUTER GRAPHS [J]. TRANSPORTATION, 1976, 5 (04) : 389 - 406