Risk Assessment of Mining Heritage Reuse in Public-Private-Partnership Mode Based on Improved Matter-Element Extension Model

被引:1
|
作者
Yang, Shan [1 ]
Zhuo, Shengyuan [1 ]
Xu, Zitong [1 ]
Chen, Jianhong [1 ]
机构
[1] Cent South Univ, Sch Resources & Safety Engn, Changsha 410083, Peoples R China
关键词
mining heritage; improved matter-element extension model; normalization process; the PPP mode; structural equation model; LIFE-CYCLE; PROJECTS; SUSTAINABILITY; INDUSTRY; CITIES;
D O I
10.3390/math11163599
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
With the development and utilization of resources, mineral-resource cities face the dilemma of resource depletion, the environmental restoration of mines, and industrial transformation. Reusing their mining heritage is a good way for these cities to change their mono-industrial structure and vigorously develop successor industries. Due to the complexity of reusing mining heritage, introducing the "Public-Private-Partnership" (PPP) mode can be a good solution to the problems of the government's mining heritage reuse, such as large capital investment and a long construction-cycle time. To accurately classify the risk of reuse of mining heritage in the PPP mode, 26 indicators are selected to construct the evaluation index system of mining heritage reuse in the PPP mode based on five aspects: social capital-side, contractor-side, government-side, civilian-side, and the natural environment. The path coefficients of the structural equation model are used to calculate the weights of the indicators. The improved matter-element extension model is constructed to evaluate the reuse of mining heritage in the PPP mode. The Jiaozuo-Centennial Mining Heritage Park project is the object of research for applying the model. The results show that the risk evaluation index system combines the risk factors from the stakeholders' perspective. The risk-evaluation model of the mining heritage reuse PPP project is constructed based on the combination of the improved matter-element extension model, the calculation of the asymmetric closeness, and the structural equation modeling method, which solves the drawbacks of the traditional model, such as the difficulty of determining the weights of the indicators, the incomplete scope of the material element domains, and the poor calculation of the comprehensive correlation degree. The case analysis shows that the risk level of the Jiaozuo-Centennial Mining Heritage Park project is Level II. This aligns with the actual situation and verifies the feasibility of the risk-evaluation model applied to the actual project. The research in this paper fills the gap in the risk model of mining heritage reuse in the PPP mode, enriches the theoretical system of risk evaluation of mining heritage reuse projects, and provides reference significance for similar mining heritage development projects in the future.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] A Risk Assessment Method of Chemical Contaminants in Meat Products Based on Improved Matter-Element Extension Model
    Dou, Haifeng
    Chen, Yi
    Wu, Caixia
    Guo, Wei
    Zhang, Feng
    [J]. Shipin Kexue/Food Science, 2023, 44 (11): : 1 - 8
  • [2] A Risk Assessment Model of Coalbed Methane Development Based on the Matter-Element Extension Method
    Wang, Wanqing
    Lyu, Shuran
    Zhang, Yudong
    Ma, Shuqi
    [J]. ENERGIES, 2019, 12 (20)
  • [3] Private College's Education Risk Assessment and Early Warning Mechanism Research Based on the Extension Matter-Element Model
    Wang, Dongling
    [J]. 2015 2ND INTERNATIONAL CONFERENCE ON CREATIVE EDUCATION (ICCE 2015), PT 1, 2015, 10 : 413 - 418
  • [4] Operation Health Assessment of Power Market Based on Improved Matter-Element Extension Cloud Model
    Dong, Jun
    Wang, Dongxue
    Liu, Dongran
    Ainiwaer, Palidan
    Nie, Linpeng
    [J]. SUSTAINABILITY, 2019, 11 (19)
  • [5] Risk Assessment Model Of Urban Subway Based On Public Private Partnership Mode
    Yan Jingning
    Li Wenkang
    [J]. PROCEEDINGS 2015 SIXTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND ENGINEERING APPLICATIONS ISDEA 2015, 2015, : 700 - 703
  • [6] Slope Stability Assessment Based on Fuzzy Matter-element Extension Model
    Liu, Jinfeng
    Ou, Guoqiang
    You, Yong
    [J]. PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 366 - 370
  • [7] Risk assessment of urban network planning in china based on the matter-element model and extension analysis
    He Yong-xiu
    Dai Ai-ying
    Zhu Jiang
    He Hai-ying
    Li Furong
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (03) : 775 - 782
  • [8] Risk Assessment of TBM Construction Based on a Matter-Element Extension Model with Optimized Weight Distribution
    Fu, Tao
    Shi, Kebin
    Shi, Renyi
    Lu, Zhipeng
    Zhang, Jianming
    [J]. APPLIED SCIENCES-BASEL, 2024, 14 (13):
  • [9] Eutrophication Assessment of Reservoir Based on Matter-element and Extension
    Pan, Jun
    Liu, Yang
    Li, Changhong
    Wang, Juan
    [J]. ADVANCES IN ENVIRONMENTAL ENGINEERING, 2012, 599 : 229 - 232
  • [10] Demand response evaluation of RIES based on improved matter-element extension model
    Wang, Yongli
    Li, Fang
    Yang, Jiale
    Zhou, Minhan
    Song, Fuhao
    Zhang, Danyang
    Xue, Lu
    Zhu, Jinrong
    [J]. ENERGY, 2020, 212