Bank erosion under the impacts of hydraulic erosion, river stage change and revetment protection in the Middle Yangtze River

被引:6
|
作者
Zhou, Yueyao [1 ]
Xia, Junqiang [1 ]
Deng, Shanshan [1 ]
Han, Zhong [2 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources Engn & Management, Wuhan 430072, Hubei, Peoples R China
[2] Wuhan Univ, Sch Civil Engn, Wuhan 430072, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
River stage change; Bank stability; Soil stress distribution; Middle Yangtze River; GROUND-WATER SEEPAGE; JINGJIANG REACH; STABILITY; PRESSURE; RETREAT;
D O I
10.1016/j.geomorph.2023.109043
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Bank failures in alluvial rivers are a typical soil-water interaction problem, which is related to many factors including the direct action of flow, river stage change, and human actions (such as bank revetment). To investigate the failure mechanism of protected riverbanks and possible factors affecting their stability, we analyzed data measured from a typical reach of the Middle Yangtze River. Furthermore, we performed numerical simulations of seepage and stress variation inside the riverbank. The field observation and simulated results indicated that: (1) Hydraulic erosion by near -bank flow remains the primary factor influencing the erosion of the protected riverbank. However, the bank protection works effectively limit the lateral bank retreat but increase the incision of the nearby riverbed, with the largest erosion depth of 10.6 m during August to November in 2020. (2) The initial damage in protected banks may be triggered by local tensile stress concentration during the water-rising period, under the combined actions of hydrostatic confining force, pore water pressure and gravity. This initial damage will progress into more severe bank failure events, particularly during the flood period. (3) After the regulation of the Three Gorges Project, the increased changing rate of river stage (similar to 1.6-2.5 fold) could potentially increase the risk of damage to protected riverbanks in the Middle Yangtze River.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Hydraulic erosion tests on river bank slope units in middle and lower reaches of Yangtze River
    Li, Ruixiang
    Zhou, Cheng
    Li, Xu
    He, Ning
    Zhong, Qiming
    Zhang, Guirong
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2024, 46 : 53 - 58
  • [2] Riparian Groundwater Level Variation and Its Impacts on Bank Erosion in the Middle Yangtze River
    Deng, Shanshan
    Xia, Junqiang
    Zhou, Meirong
    Zhou, Yueyao
    Liu, Xin
    Li, Zhiwei
    [J]. WATER RESOURCES RESEARCH, 2022, 58 (07)
  • [3] Prediction and early-warning of bank erosion in the Middle Yangtze River, China
    Deng, Shanshan
    Xia, Junqiang
    Zhou, Yueyao
    Zhou, Meirong
    Zhu, Heng
    [J]. CATENA, 2024, 242
  • [4] Bank erosion and protection on the Brahmaputra (Jamuna) River
    Bhuiyan, ABMF
    Hossain, MM
    Hey, R
    [J]. HYDRAULIC INFORMATION MANAGEMENT, 2002, 10 : 173 - 182
  • [5] Coupled modeling of bed deformation and bank erosion in the Jingjiang Reach of the middle Yangtze River
    Deng, Shanshan
    Xia, Junqiang
    Zhou, Meirong
    Lin, Fenfen
    [J]. JOURNAL OF HYDROLOGY, 2019, 568 : 221 - 233
  • [6] Bank Processes and Revetment Erosion of a Large Lowland River: Case Study of the Lower Tisza River, Hungary
    Kiss, Timea
    Amissah, Gabriel J.
    Fiala, Karoly
    [J]. WATER, 2019, 11 (06)
  • [7] On bank revetment works for the Yangtze river in Anhui Province
    Wang, Jun
    [J]. Renmin Changjiang/Yangtze River, 2002, 33 (08):
  • [8] Prediction of river bank erosion and protection works in a reach of Chenab River, Pakistan
    Ashraf, Muhammad
    Shakir, Abdul Sattar
    [J]. ARABIAN JOURNAL OF GEOSCIENCES, 2018, 11 (07)
  • [9] Prediction of river bank erosion and protection works in a reach of Chenab River, Pakistan
    Muhammad Ashraf
    Abdul Sattar Shakir
    [J]. Arabian Journal of Geosciences, 2018, 11
  • [10] Recognition of Fluvial Bank Erosion Along the Main Stream of the Yangtze River
    Yan, Ge
    Cheng, Heqin
    Jiang, Zeyu
    Teng, Lizhi
    Tang, Ming
    Shi, Tian
    Jiang, Yuehua
    Yang, Guoqiang
    Zhou, Quanping
    [J]. ENGINEERING, 2022, 19 : 50 - 61