Design of Shewhart-type control charts with estimated parameter for the Rayleigh distribution using frequentist and Bayesian approaches

被引:3
|
作者
Gong, Pingye [1 ]
Xia, Qiming [1 ]
Xuan, Jie [1 ]
Saghir, Aamir [2 ]
Guo, Baocai [1 ,3 ]
机构
[1] Zhejiang Gongshang Univ, Sch Stat, Hangzhou, Peoples R China
[2] Mirpur Univ Sci & Technol, Dept Stat, Mirpur, Pakistan
[3] Zhejiang Gongshang Univ, Collaborat Innovat Ctr Stat Data Engn Technol & A, Hangzhou, Peoples R China
来源
关键词
Rayleigh distribution; conditional average run length; exceedance probability criterion; frequentist and bayesian approaches; predictive distribution; RUN-LENGTH; (X)OVER-BAR; PERFORMANCE; EVENTS; TIMES;
D O I
10.1080/16843703.2022.2124778
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Studies on control charts with estimated parameters have received much attention in the recent literature. In this paper, the effect of parameter estimation on the performance of the Shewhart-type chart for the Rayleigh distribution, namely the V-R chart, is first studied under the conditional perspective. It is found that parameter estimation has a serious effect on the performance of the frequentist V-R chart. In order to solve this problem, the frequentist V-R chart is adjusted by using the exceedance probability criterion to guarantee the in-control performance. Since the frequentist VR chart uses the sample information from Phase I, but not the process information from past experience, an alternative chart, namely the Bayesian V-R chart, is proposed based on the predictive distribution of the plotting statistic. The performances of the Bayesian and adjusted frequentist V-R charts are evaluated and compared in terms of the percentiles, mean, and standard deviation of the conditional average run length distribution. The results suggest that the Bayesian chart outperforms the frequentist counterpart, especially when more prior information is available.
引用
收藏
页码:450 / 467
页数:18
相关论文
共 35 条
  • [1] SHEWHART-TYPE CONTROL CHARTS FOR INDIVIDUAL OBSERVATIONS
    ROES, KCB
    DOES, RJMM
    SCHURINK, Y
    [J]. JOURNAL OF QUALITY TECHNOLOGY, 1993, 25 (03) : 188 - 198
  • [2] Synthetic Phase II Shewhart-type Attributes Control Charts When Process Parameters are Estimated
    Castagliola, Philippe
    Wu, Shu
    Khoo, Michael B. C.
    Chakraborti, S.
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2014, 30 (03) : 315 - 335
  • [3] On The Reliability of Shewhart-Type Control Charts for Multivariate Process Variability
    Djauhari, Maman A.
    Salleh, Rohayu Mohd
    Zolkeply, Zunnaaim
    Li, Lee Siaw
    [J]. 3RD ISM INTERNATIONAL STATISTICAL CONFERENCE 2016 (ISM III): BRINGING PROFESSIONALISM AND PRESTIGE IN STATISTICS, 2017, 1842
  • [4] Two simple Shewhart-type multivariate nonparametric control charts
    Boone, J. M.
    Chakraborti, S.
    [J]. APPLIED STOCHASTIC MODELS IN BUSINESS AND INDUSTRY, 2012, 28 (02) : 130 - 140
  • [5] Probability-type, Shewhart-type and EWMA control charts for individual observations from the two-parameter Lindley distribution
    Demertzi, Elisavet
    Psarakis, Stelios
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2024, 40 (01) : 313 - 338
  • [6] Nonparametric Shewhart-Type Sign Control Charts Based on Runs
    Human, S. W.
    Chakraborti, S.
    Smit, C. F.
    [J]. COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2010, 39 (11) : 2046 - 2062
  • [7] On Designing of Bayesian Shewhart-Type Control Charts for Maxwell Distributed Processes with Application of Boring Machine
    Alshahrani, Fatimah
    Almanjahie, Ibrahim M.
    Khan, Majid
    Anwar, Syed M.
    Rasheed, Zahid
    Cheema, Ammara N.
    [J]. MATHEMATICS, 2023, 11 (05)
  • [8] Shewhart-type control charts for variation in phase I data analysis
    Human, S. W.
    Chakraborti, S.
    Smit, C. F.
    [J]. COMPUTATIONAL STATISTICS & DATA ANALYSIS, 2010, 54 (04) : 863 - 874
  • [9] Phase II Shewhart-type Control Charts for Monitoring Times Between Events and Effects of Parameter Estimation
    Kumar, Nirpeksh
    Chakraborti, Subhabrata
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2016, 32 (01) : 315 - 328
  • [10] A UNIFIED APPROACH FOR SHEWHART-TYPE PHASE I CONTROL CHARTS FOR THE MEAN
    Human, S. W.
    Chakraborti, S.
    [J]. INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2010, 17 (03): : 199 - 208