Third-Monthly Hydropower Scheduling of Cascaded Reservoirs Using Successive Quadratic Programming in Trust Corridor

被引:4
|
作者
Liu, Shuangquan [1 ]
Luo, Jingzhen [2 ]
Chen, Hui [2 ]
Wang, Youxiang [1 ]
Li, Xiangyong [1 ]
Zhang, Jie [1 ]
Wang, Jinwen [3 ,4 ]
机构
[1] Yunnan Power Grid Co Ltd, Syst Operat Dept, 73 Tuodong Rd, Kunming 650011, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Civil & Hydraul Engn, 1037 Luoyu Rd, Wuhan 430074, Peoples R China
[3] Huazhong Univ Sci & Technol, Inst Water Resources & Hydropower, 1037 Luoyu Rd, Wuhan 430074, Peoples R China
[4] Huazhong Univ Sci & Technol, Hubei Key Lab Digital River Basin Sci & Technol, 1037 Luoyu Rd, Wuhan 650041, Peoples R China
关键词
hydropower scheduling; successive quadratic programming; trust corridor; concave linearization; reservoir operation; GENETIC ALGORITHM; OPERATING RULES; OPTIMIZATION; GENERATION;
D O I
10.3390/w15040716
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The third-monthly (about 10 days in a time-step) hydropower scheduling, typically a challenging nonlinear optimization, is one of the essential tasks in a power system with operational storage hydropower reservoirs. This work formulates the problem into quadratic programming (QP), which is solved successively, with the linearization updated on the nonlinear constraint of the firm hydropower yield from all the cascaded hydropower reservoirs. Notably, the generating discharge is linearly concaved with two planes, and the hydropower output is defined as a quadratic function of reservoir storage, release, and generating discharge. The application of the model and methods to four cascaded hydropower reservoirs on the Jinsha River reveals several things: the successive quadratic programming (SQP) presented in this work can derive results consistent with those by the dynamic programming (DP), typically with the difference in water level within 0.01m; it has fast convergence and computational time increasing linearly as the number of reservoirs increases, with the most significant improvement in the objective at the second iteration by about 20%; and it is capable of coordinating the cascaded reservoir very well to sequentially maximize the firm hydropower yield and the total hydropower production.
引用
收藏
页数:15
相关论文
共 5 条
  • [1] Monthly Hydropower Scheduling of Cascaded Reservoirs Using a Genetic Algorithm with a Simulation Procedure
    Baima, Deji
    Qian, Guoyuan
    Luo, Jingzhen
    Wang, Pengcheng
    Zheng, Hao
    Wang, Jinwen
    [J]. ENERGIES, 2024, 17 (15)
  • [2] A Monthly Hydropower Scheduling Model of Cascaded Reservoirs with the Zoutendijk Method
    Zhou, Binbin
    Feng, Suzhen
    Xu, Zifan
    Jiang, Yan
    Wang, Youxiang
    Chen, Kai
    Wang, Jinwen
    [J]. WATER, 2022, 14 (23)
  • [3] A Special Ordered Set of Type 2 Modeling for a Monthly Hydropower Scheduling of Cascaded Reservoirs with Spillage Controllable
    Liu, Shuangquan
    Qian, Guoyuan
    Xu, Zifan
    Wang, Hua
    Chen, Kai
    Wang, Jinwen
    Feng, Suzhen
    [J]. WATER, 2023, 15 (17)
  • [4] Short-term optimal scheduling of cascaded hydropower stations based on sequential quadratic programming
    Wu, Jiekang
    Tang, Li
    Han, Junfeng
    [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2010, 30 (SUPPL.): : 43 - 48
  • [5] Optimal Re-Dispatching of Cascaded Hydropower Plants Using Quadratic Programming and Chance-Constrained Programming
    Fekete, Kresimir
    Nikolovski, Srete
    Klaic, Zvonimir
    Androjic, Ana
    [J]. ENERGIES, 2019, 12 (09)