Post-Processing Ensemble Precipitation Forecasts and Their Applications in Summer Streamflow Prediction over a Mountain River Basin

被引:1
|
作者
Xiang, Yiheng [1 ,2 ]
Liu, Yanghe [3 ]
Zou, Xiangxi [3 ]
Peng, Tao [1 ,2 ]
Yin, Zhiyuan [1 ,2 ]
Ren, Yufeng [3 ]
机构
[1] China Meteorol Adm, Basin Heavy Rainfall Key Lab, Hubei Key Lab Heavy Rain Monitoring & Warning Res, Inst Heavy Rain, Wuhan 430205, Peoples R China
[2] Three Gorges Natl Climatol Observ, Yichang 443099, Peoples R China
[3] China Yangtze Power Co Ltd, Hubei Key Lab Intelligent Yangtze & Hydroelect Sci, Yichang 443000, Peoples R China
关键词
ensemble forecasts; precipitation post-process; Bayesian model averaging (BMA); generated-based post-processing (GPP); summer streamflow prediction; mountainous river basin; WEATHER FORECASTS; ECMWF; CHINA;
D O I
10.3390/atmos14111645
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Ensemble precipitation forecasts (EPFs) can help to extend lead times and provide reliable probabilistic forecasts, which have been widely applied for streamflow predictions by driving hydrological models. Nonetheless, inherent biases and under-dispersion in EPFs require post-processing for accurate application. It is imperative to explore the skillful lead time of post-processed EPFs for summer streamflow predictions, particularly in mountainous regions. In this study, four popular EPFs, i.e., the CMA, ECMWF, JMA, and NCEP, were post-processed by two state of art methods, i.e., the Bayesian model averaging (BMA) and generator-based post-processing (GPP) methods. These refined forecasts were subsequently integrated with the Xin'anjiang (XAJ) model for summer streamflow prediction. The performances of precipitation forecasts and streamflow predictions were comprehensively evaluated before and after post-processing. The results reveal that raw EPFs frequently deviate from ensemble mean forecasts, particularly underestimating torrential rain. There are also clear underestimations of uncertainty in their probabilistic forecasts. Among the four EPFs, the ECMWF outperforms its peers, delivering skillful precipitation forecasts for 1-7 lead days and streamflow predictions for 1-4 lead days. The effectiveness of post-processing methods varies, yet both GPP and BMA address the under-dispersion of EPFs effectively. The GPP method, recommended as the superior method, can effectively improve both deterministic and probabilistic forecasting accuracy. Moreover, the ECMWF post-processed by GPP extends the effective lead time to seven days and reduces the underestimation of peak flows. The findings of this study underscore the potential benefits of adeptly post-processed EPFs, providing a reference for streamflow prediction over mountain river basins.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Hydrological post-processing of streamflow forecasts issued from multimodel ensemble prediction systems
    Xu, Jing
    Anctil, Francois
    Boucher, Marie-Amelie
    [J]. JOURNAL OF HYDROLOGY, 2019, 578
  • [2] Bias correction of ensemble precipitation forecasts in the improvement of summer streamflow prediction skill
    Yang, Chunlei
    Yuan, Huiling
    Su, Xiang
    [J]. JOURNAL OF HYDROLOGY, 2020, 588
  • [3] On the verification of ensemble precipitation forecasts over the Godavari River basin
    Manikanta, Velpuri
    Das, Jew
    Teja, K. Nikhil
    Umamahesh, N. V.
    [J]. JOURNAL OF HYDROLOGY, 2023, 616
  • [4] Probabilistic streamflow forecast based on spatial post-processing of TIGGE precipitation forecasts
    Aminyavari, Saleh
    Saghafian, Bahram
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2019, 33 (11-12) : 1939 - 1950
  • [5] Probabilistic streamflow forecast based on spatial post-processing of TIGGE precipitation forecasts
    Saleh Aminyavari
    Bahram Saghafian
    [J]. Stochastic Environmental Research and Risk Assessment, 2019, 33 : 1939 - 1950
  • [6] Post-processing of ETA/RSM ensemble precipitation forecasts by a neural network
    Mullen, SL
    Poulton, MM
    Brooks, HE
    Hamill, TM
    [J]. 14TH CONFERENCE ON PROBABILITY AND STATISTICS IN THE ATMOSPHERIC SCIENCES, 1998, : J103 - J104
  • [7] Post-processing of ETA/RSM ensemble precipitation forecasts by a neural network
    Mullen, SL
    Poulton, MM
    Brooks, HE
    Hamill, TM
    [J]. FIRST CONFERENCE ON ARTIFICIAL INTELLIGENCE, 1998, : J31 - J32
  • [8] Post-Processing and Evaluation of Precipitation Ensemble Forecast under Multiple Schemes in Beijiang River Basin
    Chen, Xinchi
    Chen, Xiaohong
    Huang, Dong
    Liu, Huamei
    [J]. WATER, 2020, 12 (09)
  • [9] Evaluation of ensemble precipitation forecasts generated through post-processing in a Canadian catchment
    Jha, Sanjeev K.
    Shrestha, Durga L.
    Stadnyk, Tricia A.
    Coulibaly, Paulin
    [J]. HYDROLOGY AND EARTH SYSTEM SCIENCES, 2018, 22 (03) : 1957 - 1969
  • [10] Intercomparison of multiple statistical methods in post-processing ensemble precipitation and temperature forecasts
    Li, Xiangquan
    Chen, Jie
    Xu, Chong-Yu
    Chen, Hua
    Guo, Shenglian
    [J]. METEOROLOGICAL APPLICATIONS, 2020, 27 (04)