Scheduling the repair and replacement of individual components in operating systems: a bi-objective mathematical optimization model

被引:0
|
作者
Obradovic, Gabrijela [1 ,2 ]
Stroemberg, Ann-Brith [1 ,2 ]
Lundberg, Kristian [3 ]
机构
[1] Chalmers Univ Technol, Dept Math Sci, Gothenburg, Sweden
[2] Univ Gothenburg, Gothenburg, Sweden
[3] Saab AB, Linkoping, Sweden
关键词
System maintenance; Workshop scheduling; Mixed-binary linear optimization model; Optimization of contracting forms; Simultaneous scheduling; Bi-objective optimization; MAINTENANCE; FLIGHT;
D O I
10.1007/s10951-023-00800-x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Preventive maintenance (PM) is performed so that failure is avoided while corrective maintenance is performed after a failure has occurred in order to restore the system back to an operational state. This research aims at scheduling PM activities for a multi-component system within a finite time horizon. We consider a setting with two stakeholders, being the system operator and the maintenance workshop, and two different contract types governing their joint activities, namely an availability contract and a turn-around time contract. Components in the systems that are to be maintained are sent to the maintenance workshop, which needs to schedule and perform all maintenance activities while at the same time satisfying the contract and not exceeding the workshop capacity. Our modelling is based on a mixed-binary linear optimization model of a PM scheduling problem with so-called interval costs over a finite and discretized time horizon. We enhance this scheduling model with the flow of individual components through the maintenance workshop, including stocks of spare components, both those components that need repair and the repaired ones. The resulting scheduling model is then utilized in the optimization of two main contracts, namely maximizing the availability of repaired (or new) components and minimizing the deviation from the contracted turn-around times for the components in the maintenance loop. Each of these objectives is combined with the objective to minimize the costs for maintenance of the operating system, leading to two bi-objective optimization problems. We analyse the two contracting forms between the stakeholders by studying and comparing the Pareto fronts resulting from different parameter settings, regarding minimum allowed stock levels and investments in repair capacity of the workshop. Our bi-objective mixed-binary linear optimization model is able to capture important properties of the results from the contracting forms as well as to show that, in our setting, an availability contract performs better than a turn-around time contract in terms of tractability.
引用
收藏
页码:87 / 101
页数:15
相关论文
共 50 条
  • [1] Scheduling the repair and replacement of individual components in operating systems: a bi-objective mathematical optimization model
    Gabrijela Obradović
    Ann-Brith Strömberg
    Kristian Lundberg
    Journal of Scheduling, 2024, 27 : 87 - 101
  • [2] Simultaneous scheduling of replacement and repair of common components in operating systems A multi-objective mathematical optimization model
    Obradovic, Gabrijela
    Stromberg, Ann-Brith
    Lundberg, Kristian
    ANNALS OF OPERATIONS RESEARCH, 2023, 322 (01) : 147 - 165
  • [3] Simultaneous scheduling of replacement and repair of common components in operating systemsA multi-objective mathematical optimization model
    Gabrijela Obradović
    Ann-Brith Strömberg
    Kristian Lundberg
    Annals of Operations Research, 2023, 322 : 147 - 165
  • [4] Bi-objective optimization of maintenance scheduling for power systems
    Hadjaissa, B.
    Ameur, K.
    Cheikh, S. M. Ait
    Essounbouli, N.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 85 (5-8): : 1361 - 1372
  • [5] Bi-objective optimization of maintenance scheduling for power systems
    B. Hadjaissa
    K. Ameur
    S. M. Ait cheikh
    N. Essounbouli
    The International Journal of Advanced Manufacturing Technology, 2016, 85 : 1361 - 1372
  • [6] A Bi-Objective Paediatric Operating Theater Scheduling
    Dekhici, Latifa
    Belkadi, Khaled
    INTERNATIONAL JOURNAL OF HEALTHCARE INFORMATION SYSTEMS AND INFORMATICS, 2023, 18 (01)
  • [7] Technology enhancement of surgeries scheduling: a bi-objective optimization model
    Khalfalli, Marwa
    Ben Abdelaziz, Fouad
    Verny, Jerome
    Masmoudi, Meryem
    MANAGEMENT DECISION, 2020, 58 (11) : 2513 - 2525
  • [8] Stable maintenance tasks scheduling: A bi-objective robust optimization model
    Golpira, Heris
    Tirkolaee, Erfan Babaee
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [9] A BI-OBJECTIVE OPTIMIZATION ALGORITHM FOR AUTOMOBILE MANUFACTURING SCHEDULING
    Alatangaowa, B.
    Batbileg, S.
    Enkhbat, R.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (01) : 146 - 156
  • [10] Bi-objective mathematical model and improved algorithm for optimisation of welding shop scheduling problem
    Rao, Yunqing
    Meng, Ronghua
    Zha, Jing
    Xu, Xiaofei
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (09) : 2767 - 2783