Response of flood regulation service to land use changes and dam construction-A case study in the Yangtze River Basin

被引:2
|
作者
Shen, Ju [1 ,2 ]
Li, Jingwei [1 ]
Ma, Qun [1 ]
Wang, Dan [1 ]
Du, Shiqiang [1 ]
机构
[1] Shanghai Normal Univ, Sch Environm & Geog Sci, Shanghai 200234, Peoples R China
[2] Shanghai Emergency Management & Chem Registrat Ctr, Shanghai 200020, Peoples R China
关键词
Ecosystem service; Flood risk; Land -based measures; Engineered measures; Transfer matrix; Watershed management; SUPPLY-AND-DEMAND; ECOSYSTEM SERVICES; CHINA; DISASTER; WATER;
D O I
10.1016/j.ecolind.2023.110715
中图分类号
X176 [生物多样性保护];
学科分类号
090705 ;
摘要
Flood regulation service (FRS) is essential for a sustainable landscape and human society. It is not only subject to land use changes, but also affected by engineered measures (e.g., dam construction). However, the comprehensive impacts of the two major driving factors are still to be elucidated. To fill the research gap, this paper aims to evaluate the response of basin-scale FRS supply and demand to land use changes and dam construction. A case study in the Yangtze River Basin, China, shows that the 2020 FRS supply is mainly from land uses (84.85%) rather than dams (15.15%), with the biggest contributions from water bodies (rivers and lakes, 30.00%) and forests (29.35%). Between 1980 and 2020, the total FRS supply has increased by 10.50%, from 1.48 x 1010 m3 to 1.64 x 1010 m3. The net increase mainly comes from dam construction (84.65%) rather than land use changes (15.35%). Regarding the land use changes, the developed transfer matrix shows the ecosystem FRS flows and indicates that both the land use change amount and direction play a key role, e.g., the declines in farmlands have increased ecosystem FRS supplies when transiting into forest lands (by 3.68 x 108 m3) and water bodies (by 1.37 x 109 m3), while have decreased the ecosystem FRS supplies by -1.96 x 107 m3 with the transition into construction lands. These findings could shed light on the divergent roles between land-based measures and engineered measures in managing flood risk.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Flood Risk Index for Land-Use Changes: Case Study of Pakpanang River Basin
    Kittikhun, Chonlatid
    Pilailar, Sitang
    Chittaladakorn, Suwatana
    Jhonpadit, Eakawat
    [J]. ENGINEERING JOURNAL-THAILAND, 2020, 24 (05): : 25 - 40
  • [2] Policy changes in dam construction and biodiversity conservation in the Yangtze River Basin, China
    Xu, Hongzhang
    Pittock, Jamie
    [J]. MARINE AND FRESHWATER RESEARCH, 2021, 72 (02) : 228 - 243
  • [3] The Analysis of the Impact of Land-Use Changes on Flood Exposure of Wuhan in Yangtze River Basin, China
    Jie Liu
    Shao-yu Wang
    Dong-mei Li
    [J]. Water Resources Management, 2014, 28 : 2507 - 2522
  • [4] The Analysis of the Impact of Land-Use Changes on Flood Exposure of Wuhan in Yangtze River Basin, China
    Liu, Jie
    Wang, Shao-yu
    Li, Dong-mei
    [J]. WATER RESOURCES MANAGEMENT, 2014, 28 (09) : 2507 - 2522
  • [5] Geomorphometric Assessment of the Impacts of Dam Construction on River Disconnectivity and Flow Regulation in the Yangtze Basin
    Yang, Xiankun
    Lu, Xixi
    Ran, Lishan
    Tarolli, Paolo
    [J]. SUSTAINABILITY, 2019, 11 (12):
  • [6] The Response of Land Surface Temperature Changes to the Vegetation Dynamics in the Yangtze River Basin
    Liu, Jinlian
    Liu, Shiwei
    Tang, Xuguang
    Ding, Zhi
    Ma, Mingguo
    Yu, Pujia
    [J]. REMOTE SENSING, 2022, 14 (20)
  • [7] A study of land use changes and its impacts on flood inundation in the Konkoure River Basin, Republic of Guinea
    Alhassane Bah
    Hongbo Zhang
    Zhumei Luo
    Jimin Hu
    Zulian Zhang
    Yang Lin Xie
    Ting Yang
    Guohong Chen
    Alseny Bah
    [J]. Environmental Monitoring and Assessment, 2024, 196
  • [8] A study of land use changes and its impacts on flood inundation in the Konkoure River Basin, Republic of Guinea
    Bah, Alhassane
    Zhang, Hongbo
    Luo, Zhumei
    Hu, Jimin
    Zhang, Zulian
    Xie, Yang Lin
    Yang, Ting
    Chen, Guohong
    Bah, Alseny
    [J]. ENVIRONMENTAL MONITORING AND ASSESSMENT, 2024, 196 (02)
  • [9] Determining the influencing distance of dam construction and reservoir impoundment on land use: A case study of Manwan Dam, Lancang River
    Zhao, Qinghe
    Liu, Shiliang
    Deng, Li
    Dong, Shikui
    Yang, Zhifeng
    Liu, Qi
    [J]. ECOLOGICAL ENGINEERING, 2013, 53 : 235 - 242
  • [10] Determining the influencing distance of dam construction and reservoir impoundment on land use: A case study of Manwan Dam, Lancang River
    State Key Laboratory of Water Environment Simulation, School of Environment, Beijing Normal University, Beijing 100875, China
    不详
    [J]. Ecol. Eng, (235-242):