共 50 条
- [1] CPM, PERT and Project Management With Fuzzy Logic Technique and Implementation On A Business [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON LEADERSHIP, TECHNOLOGY, INNOVATION AND BUSINESS MANAGEMENT (ICLTIBM-2014), 2015, 210 : 348 - 357
- [2] CONSTRUCTION PROJECTS RISK ASSESSMENT BASED ON PERT, CPM AND PROJECT MANAGEMENT WITH FUZZY LOGIC TECHNIQUE [J]. ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2022, 21 (09): : 5385 - 5395
- [4] A critical comparison between CPM and PERT with Monte Carlo simulation in project management and scheduling [J]. CIVIL ENGINEERING AND URBAN PLANNING III, 2014, : 1 - 4
- [5] Algorithm for High-Throughput Scheduling of Paced Sequences [J]. SUSTAINABLE MANUFACTURING - HAND IN HAND TO SUSTAINABILITY ON GLOBE, 2020, 43 : 223 - 230
- [6] A Fast Microbial Detection Algorithm Based on High-Throughput Sequencing [J]. INTERNATIONAL SYMPOSIUM ON SIGNAL PROCESSING BIOMEDICAL ENGINEERING, AND INFORMATICS (SPBEI 2013), 2014, : 336 - 343
- [8] Compound Management for Quantitative High-Throughput Screening [J]. JALA - Journal of the Association for Laboratory Automation, 2008, 13 (02): : 79 - 89