Investigating Risk-Constraint Nexus of Construction Projects in Caribbean Small Island Developing States

被引:0
|
作者
Shih, Hsu-Shih [1 ]
Chen, I-Fei [1 ,3 ]
Munier, Nolberto [2 ]
Alcide, Zena [1 ]
机构
[1] Tamkang Univ, New Taipei, Taiwan
[2] Univ Politecn Valencia, Valencia, Spain
[3] Tamkang Univ, Dept Management Sci, 151 Yingzhuan Rd Tamsui, New Taipei 251301, Taiwan
来源
SAGE OPEN | 2023年 / 13卷 / 01期
关键词
risk factors; risk management; project implementation constraints; construction projects; ROAD CONSTRUCTION; SCHEDULE DELAYS; MANAGEMENT; COST; IDENTIFICATION; INDICATORS;
D O I
10.1177/21582440231158023
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
This research identifies the critical risk factors in the management of construction projects and assesses their relationship on the project implementation constraints of cost, time, and quality, in order to gain a deeper understanding of those factors hindering project success in in Caribbean small island developing states experiencing the dilemma of transitioning to be sustainable in economy and environment. Through three-phase surveys, we identify 26 risk factors from five risk source categories that are more region-specific to influence construction project management, discover strongly positive relationships between a set of risk variables and a set of constraints, and estimate the relative importance of every dimension to the integrated risk-constraint canonical correlation. In risk categories, management has the dominant effect followed by design, contractual, and financial source. For implementation constraints, cost exhibits the most dominance, followed by time and quality. Overall, the directions and magnitudes of interactions gauged in the risk-constraint nexus provide a guideline for improving project planning, thus offering a reference value to other developing countries.