共 50 条
Techno-economic and environmental assessment of different municipal wastewater treatment systems
被引:7
|作者:
Cicekalan, Busra
[1
]
Kosar, Sadiye
[1
]
Cingoz, Seyma
[2
]
Eyit, Nigar
[2
]
Ersahin, Mustafa Evren
[1
,3
]
Ozgun, Hale
[1
,3
]
机构:
[1] Istanbul Tech Univ, Civil Engn Fac, Environm Engn Dept, Ayazaga Campus, TR-34469 Maslak, Istanbul, Turkiye
[2] Istanbul Water & Sewerage Adm, ISKI, TR-34060 Eyup, Istanbul, Turkiye
[3] Istanbul Tech Univ, Natl Res Ctr Membrane Technol, TR-34469 Maslak, Istanbul, Turkiye
关键词:
Aerobic granular sludge;
Environmental benefits;
High rate activated sludge;
Membrane bioreactor;
Municipal wastewater treatment;
Techno-economic;
AEROBIC GRANULAR SLUDGE;
ACTIVATED-SLUDGE;
MEMBRANE BIOREACTOR;
ECONOMIC-FEASIBILITY;
ENERGY-CONSUMPTION;
TREATMENT-PLANT;
COST;
PERFORMANCE;
TECHNOLOGY;
DESIGN;
D O I:
10.1016/j.jwpe.2023.103822
中图分类号:
X [环境科学、安全科学];
学科分类号:
08 ;
0830 ;
摘要:
A comprehensive economic evaluation and environmental assessment of wastewater treatment plants (WWTPs) is a precondition to ensure long-term economic, environmental, and social sustainability. In this study, a technoeconomic feasibility analysis for different modern compact municipal wastewater treatment technologies including aerobic granular sludge (AGS), high rate activated sludge (HRAS) coupled with membrane bioreactor (MBR), HRAS + MBR process, was conducted. The findings were comparatively evaluated with the conventional anaerobic/anoxic/aerobic (A2O) process. Capital, operation and maintenance (O & M) costs for each system were investigated in detail. Environmental benefits for each system were assessed and an energy balance for each system was conducted. 21 % lower energy consumption was observed in the AGS system in comparison to the A2O system. This finding might be associated with the absence of mixers, return sludge pumping and recirculation of wastewater for nitrogen removal in AGS system. The unit total cost was found to be 0.113 euro/m3, 0.091 euro/m3, and 0.195 euro/m3 for A2O process, AGS process, and HRAS + MBR process in order. Based on the energy balance and economic analysis, AGS system was found to have lower net energy consumption and total cost compared to A2O process and HRAS + MBR process. The results obtained from this study are of vital importance in the economic evaluation of the projected large new WWTPs.
引用
收藏
页数:12
相关论文