Long-Term Investigation of a Borehole Heat Exchanger (BHE) Array with the Influence of Same Inlet Temperature (SIT) and Same Heat Load (SHL) Boundaries

被引:2
|
作者
Zhang, Yuping [1 ]
Yang, Xiao [2 ]
Liu, Jun [1 ]
Liu, Boyang [3 ]
Tang, Fujiao [2 ]
Nowamooz, Hossein [4 ]
机构
[1] Shaanxi Coal Geol Grp Co Ltd, Key Lab Coal Resources Explorat & Comprehens Utili, Minist Nat Resources, Xian 710026, Peoples R China
[2] Harbin Inst Technol, Sch Transportat Sci & Engn, Harbin 150090, Peoples R China
[3] Shaanxi Zhongmei New Energy Co Ltd, Xian 710048, Peoples R China
[4] INSA Strasbourg, ICUBE, UMR 7357, CNRS, 24 Blvd Victoire, F-67084 Strasbourg, France
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
THERMAL PERFORMANCE; OPTIMIZATION; SIMULATION; PUMPS; FIELD;
D O I
10.1155/2023/3232062
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Borehole heat exchanger (BHE) array is a key element in the ground source heat pump system (GSHPS). The BHE array is traditionally simplified by assuming the same heat exchange rate for each BHE, which normally is not correspondent to the real applications. In this investigation, a TRT was firstly conducted for a site located in Shanxi Province (China) to get the local ground thermal properties. A numerical simulation framework was next verified by the TRT results. Subsequently, the ground thermal properties obtained by the TRT were used in the numerical simulation model to investigate the influence of two operation strategies on the ground temperature development of the surrounding soil and the BHE performance. The results showed that both ground temperature and BHE array performance decreased during the 8-year operation period of the BHE array in the heating mode. The ground temperature around the center BHE was lower in the same heat load (SHL) scenario (same heat load for the BHEs in the array) than in the same inlet temperature (SIT) scenario (same carrying fluid inlet temperature for the BHEs in the array), and this difference can be 2 degrees C in the 7(th) year. The annual average outlet temperature in the SHL scenario was also lower than that in the SIT scenario, especially in the long term. The investigation shows that SIT working strategy superiors the SHL strategy, providing a reference for the upcoming investigation on the design aspect of the GSHPS.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Numerical Investigation of the Long-Term Load Shifting Behaviors within the Borehole Heat Exchanger Array System
    Zou, Haijiang
    Guo, Siyu
    Wang, Ruifeng
    Wang, Fenghao
    Shen, Zhenxing
    Cai, Wanlong
    ENERGIES, 2023, 16 (05)
  • [2] Numerical investigation on the influence of groundwater flow on long-term heat extraction performance of deep borehole heat exchanger array
    Yang, Xiong
    Cai, Wanlong
    Li, Yongpeng
    Wang, Ming
    Kong, Yanlong
    Wang, Fenghao
    Chen, Chaofan
    Geothermal Energy, 2024, 12 (01)
  • [3] Long-term performance of BHE (borehole heat exchanger) fields with negligible groundwater movement
    Lazzari, Stefano
    Priarone, Antonella
    Zanchini, Enzo
    ENERGY, 2010, 35 (12) : 4966 - 4974
  • [4] Long-term high frequency monitoring of a large borehole heat exchanger array
    Naicker, Selvaraj S.
    Rees, Simon J.
    RENEWABLE ENERGY, 2020, 145 : 1528 - 1542
  • [5] The analysis of long-term borehole heat exchanger system exploitation
    Jaszczur, Marek
    Śliwa, Tomasz
    Computer Assisted Methods in Engineering and Science, 2013, 20 (03): : 227 - 235
  • [6] Long-term performance of BHE (borehole heat exchanger) fields with negligible groundwater movement (vol 35, pg 4966, 2010)
    Lazzari, Stefano
    Priarone, Antonella
    Zanchini, Enzo
    ENERGY, 2012, 39 (01) : 440 - 440
  • [7] Long-term dynamic heat transfer analysis for the borehole spacing planning of multiple deep borehole heat exchanger
    Zhang, Fangfang
    Fang, Liang
    Zhu, Ke
    Yu, Mingzhi
    Cui, Ping
    Zhang, Wenke
    Zhuang, Zhaoyi
    Fang, Zhaohong
    CASE STUDIES IN THERMAL ENGINEERING, 2022, 38
  • [8] Long-term borehole energy storage by the inlet position control for low temperature heat source application
    Ok, JungSoo
    Lim, Hwan Suk
    Karng, Sarng Woo
    Kim, Yong Ki
    Kang, Yong Tae
    ENERGY AND BUILDINGS, 2023, 294
  • [9] Analysis of heat extraction performance and long-term sustainability for multiple deep borehole heat exchanger array: A project-based study
    Cai, Wanlong
    Wang, Fenghao
    Chen, Shuang
    Chen, Chaofan
    Liu, Jun
    Deng, Jiewen
    Kolditz, Olaf
    Shao, Haibing
    Applied Energy, 2021, 289
  • [10] Analysis of heat extraction performance and long-term sustainability for multiple deep borehole heat exchanger array: A project-based study
    Cai, Wanlong
    Wang, Fenghao
    Chen, Shuang
    Chen, Chaofan
    Liu, Jun
    Deng, Jiewen
    Kolditz, Olaf
    Shao, Haibing
    APPLIED ENERGY, 2021, 289