Study on The Mechanical and Economic Performance of Super Long-Span Cable-Stayed Bridges with UHPC-Girder

被引:2
|
作者
Ai, Zubin [1 ]
Liu, Hangjun [1 ]
Zhang, Jiaguo [1 ]
Zhang, Chao [1 ]
Wang, Cong [2 ]
Jiang, Zuqian [2 ]
Xiao, Rucheng [2 ]
机构
[1] China Power Construct Rd & Bridge Grp Co Ltd, Beijing 100048, Peoples R China
[2] Tongji Univ, Dept Bridge Engn, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
UHPC girder; Cable-stayed bridge; Optimization process; Mechanical performance; Economy; TENSION;
D O I
10.1007/s12205-023-0835-0
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper introduces the mechanical and economic performance of cable-stayed bridges with ultra-high-performance concrete (UHPC) girders. Based on the determined general layout and structure system, aiming at minimizing material consumption and considering multiple constraints, the parametric analysis and optimization process of the UHPC girder were discussed. Subsequently, full-scale models of a 1,200 m cable-stayed bridge with UHPC girders and those with steel girders were established and analyzed under load combinations to evaluate their static mechanical performance. Additionally, the material consumption estimation equation was established to evaluate the economic performance of cable-stayed bridges. The economic performance of cable-stayed bridges with UHPC-girder scheme and that of steel-girder scheme were investigated and compared by theoretical calculation and finite element modelling. The results indicated that UHPC-girder cable-stayed bridges are highly competitive for super long-span cable-stayed bridges and represent a promising alternative for the design of large-span bridges in the future. This study provides valuable insights into the feasibility and potential of UHPC-girder cable-stayed bridges.
引用
收藏
页码:4744 / 4761
页数:18
相关论文
共 50 条
  • [1] Study on The Mechanical and Economic Performance of Super Long-Span Cable-Stayed Bridges with UHPC-Girder
    Zubin Ai
    Hangjun Liu
    Jiaguo Zhang
    Chao Zhang
    Cong Wang
    Zuqian Jiang
    Rucheng Xiao
    KSCE Journal of Civil Engineering, 2023, 27 : 4744 - 4761
  • [2] Investigation of seismic performance of super long-span cable-stayed bridges
    Zhang, Xin-Jun
    Zhao, Chen-Yang
    Guo, Jian
    EARTHQUAKES AND STRUCTURES, 2018, 14 (06) : 493 - 503
  • [3] Study of the aerostatic and aerodynamic stability of super long-span cable-stayed bridges
    Zhang Xinjun
    Sun Hailing
    EngineeringSciences, 2014, 12 (02) : 82 - 92
  • [4] MECHANICS PERFORMANCE OF SUPER LONG-SPAN CABLE-STAYED BRIDGES USING CFRP CABLES
    Zhang, Xin-Jun
    Dong, Ling-Long
    PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING FOR YOUNG EXPERTS, VOLS I AND II, 2008, : 1679 - 1683
  • [5] Theoretical and Experimental Study on Cable-to-girder Anchorages in Long-span Cable-stayed Bridges with Steel Box Girder
    Wei, Xing
    Li, Jun
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1315 - 1318
  • [6] Study of seismic performance of super long-span partially earth-anchored cable-stayed bridges
    Zhang, Xin-Jun
    Yu, Cong
    Zhao, Jun-Jie
    STRUCTURAL ENGINEERING AND MECHANICS, 2019, 72 (01) : 861 - 873
  • [7] Natural periods of long-span cable-stayed bridges
    Bruno, Domenico
    Leonardi, Angelo
    Journal of Bridge Engineering, 1997, 2 (03) : 105 - 115
  • [8] STATICAL BEHAVIOR OF LONG-SPAN CABLE-STAYED BRIDGES
    COMO, M
    GRIMALDI, A
    MACERI, F
    INTERNATIONAL JOURNAL OF SOLIDS AND STRUCTURES, 1985, 21 (08) : 831 - 850
  • [9] STUDY ON WIND STABILITY OF SUPER LONG-SPAN PARTIALLY EARTH ANCHORED CABLE-STAYED BRIDGES
    Zhang, Xinjun
    Li, Xuming
    Yao, Mei
    Fundamental Research in Structural Engineering: Retrospective and Prospective, Vols 1 and 2, 2016, : 747 - 753
  • [10] Aerostatic stability of long-span cable-stayed bridges: Parametric study
    Cheng, Jin
    Jiang, Jianjing
    Xiao, Rucheng
    Xiang, Haifan
    Tsinghua Science and Technology, 2003, 8 (02) : 201 - 205