Analytic hierarchy process (AHP) assessment of Kuwait mega construction projects' complexity

被引:1
|
作者
AlKheder, Sharaf [1 ]
Al Otaibi, Hajar [1 ]
Al Baghli, Zahra [1 ]
Al Ajmi, Shaikhah [1 ]
Alkhedher, Mohammad [1 ,2 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Civil Engn Dept, Kuwait, Kuwait
[2] Abu Dhabi Univ, Mech & Ind Engn Dept, Abu Dhabi, U Arab Emirates
关键词
Analytic hierarchy process (AHP); Fuzzy analytic hierarchy process (FAHP); Mega construction projects; Complexity; Delphi;
D O I
10.1108/ECAM-10-2021-0933
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeMegaproject's construction is essential for the development and economic growth of any country, especially in the developing world. In Kuwait, megaprojects are facing many restrictions that discourage their execution causing a significant delay in bidding, design, construction and operation phases with the execution quality being affected. The objective of this study is to develop a complexity measurement model using analytic hierarchy process (AHP) for megaprojects in Kuwait, with a focus on the New Kuwait University multi-billion campus Shadadiyah (College of Social Science, Sharia and Law (CSSL)) as a case study.Design/methodology/approachThe study applies a hybrid fuzzy analytic hierarchy process (FAHP) method to compare the results with those obtained using the conventional AHP method. This can facilitate the project management activities during the different stages of construction. Data were collected based on the results of a two-round Delphi questionnaire completed by seniors and experts of the selected project.FindingsIt was found that project modeling methodology was responsible for complexity. It was grouped under several categories that include technological, goal, organizational, environmental and cultural complexities. The study compares complexity degrees assessed by AHP and FAHP methods. "Technological Complexity" scores highest in both methods, with FAHP reaching 7.46. "Goal Complexity" follows closely behind, with FAHP. "Cultural Complexity" ranks third, differing between methods, while "Organizational" and "Environmental Complexity" consistently score lower, with FAHP values slightly higher. These results show varying complexity levels across dimensions. Assessing and understanding such complexities were essential toward the completion of such megaprojects.Originality/valueThe contribution of this study is on providing the empirical evidential knowledge for the priority over construction complexities in a developing country (Kuwait) in the Middle East.
引用
收藏
页数:44
相关论文
共 50 条
  • [1] Using a Delphi process and the Analytic Hierarchy Process (AHP) to evaluate the complexity of projects
    Vidal, Ludovic-Alexandre
    Marle, Franck
    Bocquet, Jean-Claude
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (05) : 5388 - 5405
  • [2] Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects
    Aminbakhsh, Saman
    Gunduz, Murat
    Sonmez, Rifat
    [J]. JOURNAL OF SAFETY RESEARCH, 2013, 46 : 99 - 105
  • [3] Review of application of analytic hierarchy process (AHP) in construction
    Darko, Amos
    Chan, Albert Ping Chuen
    Ameyaw, Ernest Effah
    Owusu, Emmanuel Kingsford
    Parn, Erika
    Edwards, David John
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) : 436 - 452
  • [4] Measuring the complexity of mega construction projects in China-A fuzzy analytic network process analysis
    He, Qinghua
    Luo, Lan
    Hu, Yi
    Chan, Albert P. C.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (03) : 549 - 563
  • [5] Identifying Critical Criteria on Assessment of Sustainable Materials for Construction Projects in New Zealand Through the Analytic Hierarchy Process (AHP) Approach
    Qian, Jiachen
    Siriwardana, Chandana
    Shahzad, Wajiha
    [J]. Buildings, 2024, 14 (12)
  • [6] An analytic hierarchy process based model for risk and opportunity assessment of international construction projects
    Dikmen, I
    Birgonul, MT
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2006, 33 (01) : 58 - 68
  • [7] Risk assessment influencing factors for Arabian construction projects using analytic hierarchy process
    Eskander, Remon Fayek Aziz
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2018, 57 (04) : 4207 - 4218
  • [8] Comparison of Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (f-AHP) for the Sustainability Assessment of a Water Supply Project
    Natarajan N.
    Vasudevan M.
    Dineshkumar S.K.
    Anuja R.
    [J]. Journal of The Institution of Engineers (India): Series A, 2022, 103 (04) : 1029 - 1039
  • [9] Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation
    Li, Hong Xian
    Al-Hussein, Mohamed
    Lei, Zhen
    Ajweh, Ziad
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2013, 40 (12) : 1184 - 1195
  • [10] Improving On-site Management Practice for Chinese Construction Projects Based on Analytic Hierarchy Process(AHP) Method
    Li Xiao-hui
    [J]. 2015 SEVENTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2015), 2015, : 569 - 571