Stability of the loess tunnel foundation reinforced by jet grouting piles and the influence of reinforcement parameters

被引:21
|
作者
Fan, Haobo [1 ]
Xu, Qiang [1 ]
Lai, Jinxing [2 ]
Liu, Tong [3 ]
Zhu, Zhengguo [1 ]
Zhu, Yongquan [4 ]
Gao, Xinqiang [4 ]
机构
[1] Shijiazhuang Tiedao Univ, Key Lab Rd & Railway Engn Safety Control, Minist Educ, Shijiazhuang 050043, Hebei, Peoples R China
[2] Changan Univ, Sch Highway, Xian 710064, Shanxi, Peoples R China
[3] Xian Univ Architecture & Technol, Sch Sci, Xian 710055, Shaanxi, Peoples R China
[4] Shijiazhuang Tiedao Univ, State Key Lab Mech Behav & Syst Safety Traff Engn, Shijiazhuang 050043, Hebei, Peoples R China
关键词
Loess tunnel; Jet grouting pile; Geometric parameters; Foundation stability; Centrifugal model test; RAILWAY; CONSTRUCTION; SEEPAGE; FAILURE; SHIELD;
D O I
10.1016/j.trgeo.2023.100965
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The special geological characteristics of loess, such as collapsibility and vertical joint development, usually bring great difficulties to the construction of tunnel inverts. Effectively resolving the subsidence of the tunnel bottom, shortage of the bearing capacity, and uneven subsidence caused by weak loess has been a key challenge during the construction and operation of loess tunnels. Jet grouting piles are widely used because they can effectively improve the geological characteristics of loess and enhance the stability of the foundation. To investigate the reinforcement effect of jet grouting piles in loess tunnel foundations and the effect of changes in the geometric parameters of jet grouting piles on the stability of tunnel foundations, centrifugal model tests and numerical simulations were used to analyse the mechanical properties and the deformation characteristics of the tunnel lining. The results show that the deformation of the loess tunnel bottom caused by the operation and construction can be reduced effectively by using jet grouting piles, but the surrounding rock pressure and settlement of the tunnel vault will be increased at the same time. The length of the jet grouting piles has a better impact than the diameter to improve the reinforcement effect on the stability of the foundation, and the deformation of the tunnel bottom and the stress of the surrounding rock at depth are reduced greatly. Based on the relationship between the length and the reinforcement efficiency of jet grouting piles, the length of jet grouting piles is recommended to be 5-12 m.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Effects of Jet-Grouting Piles on Loess Tunnel Foundation with Centrifugal Model Tests
    Fan, Haobo
    Liu, Tong
    Zhang, Shiyu
    He, Haijun
    Zhu, Zhengguo
    Zhu, Yongquan
    Gao, Xinqiang
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2023, 23 (03)
  • [2] Displacement and Stress Characteristics of Tunnel Foundation in Collapsible Loess Ground Reinforced by Jet Grouting Columns
    Li, Youyun
    Xu, Shuoshuo
    Liu, Houquan
    Ma, Enlin
    Wang, Lixin
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [3] Model test of large section loess tunnel reinforced by jet grouting piles and its water immersion
    Li Y.
    Xie K.
    Sun Y.
    Li J.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2021, 40 : 3334 - 3343
  • [4] Pre-supporting with Horizontal Piles of Jet Grouting in Weak Loess Tunnel
    Yang Jian-guo
    Xie Yong-li
    Wang Yun-zhou
    Wei, Ma
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 4, PROCEEDINGS, 2009, : 141 - +
  • [5] Research on the Grouting Reinforcement Parameters of Tunnel Surrounding Rock in Saturated Soft Loess
    饱和软黄土隧道围岩注浆加固参数研究
    Zhang, Xuejin, 2021, Editorial Department of Journal of Railway Engineering Society (38) : 60 - 65
  • [6] Adaptability Evaluation of Rotary Jet Grouting Pile Composite Foundation for Shallow Buried Collapsible Loess Tunnel
    Li, Zhiqiang
    Zhao, Jinpeng
    Hu, Kunkun
    Li, Youyun
    Liu, Lulu
    APPLIED SCIENCES-BASEL, 2023, 13 (03):
  • [7] Development and prospect of root piles in tunnel foundation reinforcement
    Ding, Hao
    Su, Linjian
    Lai, Jinxing
    Zhang, Yuanhang
    Civil Engineering Journal, 2017, 26 (03) : 250 - 266
  • [8] Experimental research on high pressure jet grouting stabilizing loess foundation
    Wang, Jianping
    Zheng, Shansuo
    Yu, Shu
    Xi'an Jianzhu Keji Daxue Xuebao/Journal of Xi'an University of Architecture & Technology, 1997, 29 (01): : 96 - 100
  • [9] Study on repair and reinforcement for pile foundation using jet grouting
    Kamata, T.
    Shimamura, A.
    Tsuchiya, T.
    EARTHQUAKE GEOTECHNICAL ENGINEERING FOR PROTECTION AND DEVELOPMENT OF ENVIRONMENT AND CONSTRUCTIONS, 2019, 4 : 3170 - 3177
  • [10] Grouting pre-reinforcement technology for Metro tunnel in loess strata
    Lai, Hongpeng
    Kang, Zuo
    Xie, Yongli
    Gao, Xiaopei
    Zhongguo Tiedao Kexue/China Railway Science, 2014, 35 (01): : 47 - 54