Controversy in wind energy construction projects: How social systems impact project performance

被引:4
|
作者
LaPatin, Michaela [1 ]
Spearing, Lauryn A. [2 ]
Tiedmann, Helena R. [1 ]
Hacker, Miriam [3 ]
Kavvada, Olga [4 ]
Danielou, Jean [5 ]
Faust, Kasey M. [1 ]
机构
[1] Univ Texas Austin, Civil Architectural & Environm Engn, 301 Dean Keeton St C1752, Austin, TX 78712 USA
[2] Univ Illinois, Civil Mat & Environm Engn, 842 West Taylor St, Chicago, IL 60607 USA
[3] Water Res Fdn, 1199 North Fairfax St,Ste 900, Alexandria, VA 22314 USA
[4] ENGIE Lab CRIGEN, Comp Sci & Artificial Intelligence Lab CSAI, 4 Rue Josephine Baker, F-93240 Stains, France
[5] PSL Univ, Ctr Sociol Innovat, CNRS, UMR 9217,Mines ParisTech, Paris, France
关键词
Energy projects; Social systems; Construction management; Media analysis; Controversy; Stakeholder conflict; COMMUNITY ENGAGEMENT; INFRASTRUCTURE; POWER; CONSULTATION; RELIABILITY; BARRIERS; DELAY; TEXT;
D O I
10.1016/j.enpol.2023.113507
中图分类号
F [经济];
学科分类号
02 ;
摘要
The energy industry strives to address a number of challenges-satisfy increasing energy demands, fulfill renewable energy policy requirements, and update aging infrastructure. Complicating energy projects are the controversies they can stir among stakeholders, sparking disagreements about environmental, economic, and aesthetic outcomes. Conflicts such as protests, petitions, or lawsuits can lead to schedule delays and cost overruns, which are difficult for project sponsors to predict. Using literature and news media, this study aims to identify trends in project controversies across energy projects. The study uses a mixed deductive and inductive content analysis to determine which actions, project phases, and stakeholders are discussed most frequently within both academic literature and news media. Using code cooccurrences, the study evaluates which stakeholders take specific actions at different project phases. Results show that the most active opposing stakeholders to energy development projects are community members, and actions opposing a project most frequently occur in the proposal phase. These results highlight the importance of engaging with communities early in project lifecycles. Opposition typically includes dissemination of information within communities, including letters to editors, internet newsletters, and public meetings. From this analysis, policy recommendations are provided for energy project sponsors to better anticipate and mitigate conflict.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Impact of project procurement systems on performance of Rwandan building construction projects
    Esperance, Umuhoza
    Sung-Hoon, An
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2023, 15 (01): : 221 - 232
  • [2] The Impact of Project Organizational Culture on the Performance of Construction Projects
    Luong Hai Nguyen
    Watanabe, Tsunemi
    [J]. SUSTAINABILITY, 2017, 9 (05)
  • [3] Identification of knowledge assets in construction projects and their impact on project performance
    Singla, Harish Kumar
    Shrivas, Abhishek
    Sharma, Ashu
    [J]. JOURNAL OF INTELLECTUAL CAPITAL, 2022, 23 (03) : 558 - 587
  • [4] Decoding Social Sustainability in Construction Projects: Analysis of Project Dynamics and Impact
    Akhtar, Junaid
    Khan, Khurram Iqbal Ahmad
    Tahir, Muhammad Bilal
    Ullah, Fahim
    Waheed, Abdul
    [J]. BUILDINGS, 2024, 14 (03)
  • [5] Examining the Impact of Social Media Use on Project Management Performance: Evidence from Construction Projects in China
    Ma, Guofeng
    Jia, Jianyao
    Ding, Jiyong
    Wu, Ming
    Wang, Ding
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [6] Project Leadership and Its Impact on Time Performance in Nigerian Construction Projects
    Buba, Simon-Peter G.
    Chitumu, Danladi Z.
    Ibrahim, Haruna M.
    [J]. ADVANCED SCIENCE LETTERS, 2018, 24 (05) : 3791 - 3796
  • [7] PROJECT DELIVERY SYSTEMS FOR CONSTRUCTION PROJECTS
    HOHNS, HM
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (02): : 307 - 307
  • [8] PROJECT DELIVERY SYSTEMS FOR CONSTRUCTION PROJECTS
    KETTLE, KA
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1976, 102 (04): : 575 - 585
  • [9] Construction project performance areas for Indian construction projects
    Ingle, Prachi Vinod
    Mahesh, Gangadhar
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (08) : 1443 - 1454
  • [10] A Framework to Measure the Cost of Controversy Surrounding Energy Construction Projects
    LaPatin, Michaela
    Spearing, Lauryn
    Tiedmann, Helena R.
    Kavvada, Olga
    Giorda, Maria
    Danielou, Jean
    Faust, Kasey M.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 754 - 763