Performance of the Flexible and Rigid Lining under Earthquake Impact and Weakness of the New Austrian Tunneling Method (NATM) Principles, a Specific Case Study of the Bolu Tunnel

被引:2
|
作者
Aygar, Ebu Bekir [1 ]
机构
[1] Fugro Sial Geosci Consulting Engn Ltd, TR-06690 Cankaya, Ankara, Turkiye
关键词
Bolu tunnel; 12 November 1999 Duzce earthquake; tunnel collapse; NATM; 12; NOVEMBER; 1999; NORTH ANATOLIAN FAULT; DYNAMIC-ANALYSIS; SURFACE RUPTURE; STRONG-MOTION; TURKEY; DUZCE; DAMAGE; ROCK;
D O I
10.3390/su152115544
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Bolu tunnel is located between the Istanbul-Ankara Highway and its construction took approximately 13 years. Since the beginning of the tunnel excavation, serious deformations and stability problems have been encountered. The basis of the problems encountered during the tunnel excavation is the fact that the geological units through which the tunnel passes are very weak and fault lines cut the tunnel location. The fault lines pass through secondary faults in the seismically active North Anatolian Fault. At these fault crossings, deformations occurred continuously so that revisions had to be made in the support systems. The 12 November 1999 Duzce earthquake occurred on the Duzce fault and a surface rupture 40 km long was caused. The rupture terminated 1.5 km west of the tunnel; it did not reach the tunnel. Throughout the earthquake, instances of collapse occurred at the areas excavated on the fault line at the entrance of Elmalik and where the deformations exceeded 1.0 m; this section of the tunnel had to be abandoned. After these problems, a new improved design for tunnel excavation was developed. These new support systems, which are Bernold lining and bench pilot tunnel systems, contain allowance for rigid lining that is the opposite of the new Austrian tunneling method (NATM) principles. Within the scope of this study, the causes of the collapse in the tunnel are investigated and the effect of the Duzce earthquake on the tunnel is discussed. Also, the applicability of the NATM in tunnels excavated on weak zones is also discussed.
引用
收藏
页数:36
相关论文
共 3 条
  • [1] Risk Management for Beijing Subway Tunnel Construction Using the New Austrian Tunneling Method: A Case Study
    Xu, Wei
    Liu, Bo
    Fu, Chunqing
    Han, Yanhui
    Ren, Xin
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2019: SMARTER AND SAFER MOBILITY AND CITIES, 2019, : 423 - 435
  • [2] A Numerical Method for the Design of the U-Shaped Segmental Tunnel Lining under the Impact of Earthquakes: A Case Study of a Tunnel in the Hanoi Metro System
    Nguyen Chi Thanh
    Do Ngoc Anh
    Pham Van Vi
    Gospodarikov, Alexandr
    INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2021, (02): : 305 - 320
  • [3] Finding Best Model to Forecast Construction Duration of Road Tunnels with New Austrian Tunneling Method Using Bayesian Inference Case Study of Niayesh Highway Tunnel in Iran
    Hosseinian, Seyedmohammadhossein
    Reinschmidt, Kenneth F.
    TRANSPORTATION RESEARCH RECORD, 2015, (2522) : 113 - 120