Accessibility and Trajectory Planning of Cutter Changing Robot Arm for Large-Diameter Slurry Shield

被引:4
|
作者
Yang, Mei [1 ]
Zeng, Guiying [1 ]
Ren, Yong [2 ]
Lin, Laikuang [1 ]
Ke, Wei [2 ]
Liu, Yifan [1 ]
机构
[1] Cent South Univ, Coll Mech & Elect Engn, State Key Lab High Performance Complex Mfg, Changsha, Peoples R China
[2] China Railway Construction Heavy Ind Co Ltd, Changsha, Peoples R China
来源
MECHANIKA | 2023年 / 29卷 / 03期
关键词
shield machine; cutter change robot; kinematics analysis; trajectory planning; workspace; PREDICTION MODEL; TUNNEL; MACHINE; WEAR;
D O I
10.5755/j02.mech.30386
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
Aiming at solving the problems of huge cost, long cycle and high risky during manual cutter changing process for shield machine, a cutter changing robot was designed to adapt to its narrow and complex space, the workspace and motion path of cutter changing robot arm were studied. Firstly, by analyzing the internal space and cutter layout characteristic, the configuration of the robot arm was pro-posed, and the dimension of each rod was designed using multi-objective optimization method. The kinematic model of the robot arm was established by using the D-H model method to analyze its reachable working space. While the inverse kinematic model of the robot arm was solved by the Newton-Raphson iterative method to complete the trajec-tory planning of the arm for all cutter locations, where the relationship between the target position and the joint varia-bles was established. The motion stability of the robot was verified by virtual simulation and test. The results show that the working space of the designed robot arm meets the cutter changing requirements that all the cutter position can be reached. Moreover, the power output of the drive is smooth, which can transport the cutter weighing up to 250 kg.
引用
收藏
页码:214 / 224
页数:11
相关论文
共 50 条
  • [1] Comprehensive performance evaluation and sensitivity analysis method of a cutter-changing robot for a large-diameter shield machine
    Yang, Mei
    Liu, Feixiang
    Lin, Laikuang
    Zeng, Guiying
    Lang, Yuhang
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 238
  • [2] Design and Analysis of Cutter Changing Robot for Large Diameter Shield Tunneling Machine
    Han, Kaixuan
    Chen, Hao
    Yin, Chongguang
    Deng, Shusen
    Tian, Hao
    Huo, Junzhou
    2024 9TH ASIA-PACIFIC CONFERENCE ON INTELLIGENT ROBOT SYSTEMS, ACIRS, 2024, : 149 - 153
  • [3] Study on cutter configuration for directly shield cutting of large-diameter piles
    Wang, Fei
    Yuan, Dajun
    Dong, Chaowen
    Han, Bing
    Nan, Haoren
    Wang, Mengshu
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2013, 46 (12): : 127 - 135
  • [4] Effect of the nozzle structure of the large-diameter slurry shield cutterhead on the scouring characteristics
    Xiao, Xuemeng
    Xia, Yimin
    Mao, Xintong
    Wang, Yang
    Fang, Zhongyu
    Wang, Feng
    Zhao, Hequan
    JOURNAL OF THE BRAZILIAN SOCIETY OF MECHANICAL SCIENCES AND ENGINEERING, 2020, 42 (04)
  • [5] Effect of the nozzle structure of the large-diameter slurry shield cutterhead on the scouring characteristics
    Xuemeng Xiao
    Yimin Xia
    Xintong Mao
    Yang Wang
    Zhongyu Fang
    Feng Wang
    Hequan Zhao
    Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2020, 42
  • [6] Design and Trajectory Optimization of a Large-Diameter Steel Pipe Grinding Robot
    Yan, Zhouyu
    Zhao, Hong
    Miao, Xingyuan
    Gao, Boxuan
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2024, 15 (03)
  • [7] Study on Ground Vertical Deformation of Large-Diameter Slurry Shield Tunneling in Complicated Environment
    Wan Z.
    Li S.
    Chen J.
    Zhao S.
    Wang M.
    Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2021, 29 (02): : 399 - 411
  • [8] Evaluation method and application for cutter wear of large-diameter shield in composite stratum: A case study
    Wu, Jiuqi
    Chen, Xiangsheng
    Shen, Xiang
    Su, Dong
    Zhang, Yazhou
    Yao, Zhanhu
    Wang, Xiao
    MEASUREMENT, 2025, 242
  • [9] Experimental study on the slurry preparation and filter cake formation for a large-diameter slurry shield in gravel and sand stratum
    Min, Fanlu
    Xu, Jingbo
    Du, Jiarui
    Xing, Huitang
    Modern Tunnelling Technology, 2015, 52 (06) : 141 - 146
  • [10] On the modification of the ground loss parameter GAP for large-diameter slurry shield tunnelling and its application
    Jiang, Qiang
    Cheng, Haifeng
    Chen, Junping
    Modern Tunnelling Technology, 2013, 50 (05) : 92 - 97