共 50 条
- [1] A hybrid genetic algorithm for resource leveling problem PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 786 - 790
- [2] A genetic algorithm for the robust resource leveling problem Journal of Scheduling, 2016, 19 : 43 - 60
- [5] Memetic Algorithm for the Balanced Resource Location Problem with Preferences 2015 6TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS AND APPLICATIONS (IISA), 2015,
- [6] Heuristic algorithm for resource leveling problem in emergency scheduling Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (06): : 1165 - 1171
- [7] Genetic algorithm for resource leveling problem in project scheduling 2001, Systems Engineering Society of China (21):
- [8] A Memetic-GRASP Algorithm for the Solution of the Orienteering Problem MODELLING, COMPUTATION AND OPTIMIZATION IN INFORMATION SYSTEMS AND MANAGEMENT SCIENCES - MCO 2015 - PT II, 2015, 360 : 105 - 116
- [9] Memetic algorithm for the resource-constrained project scheduling problem 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
- [10] An Effective Memetic Algorithm for Resource Constrained Project Scheduling Problem 2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 2160 - 2166