A Memetic Algorithm for the Solution of the Resource Leveling Problem

被引:1
|
作者
Iranagh, Mehdi [1 ]
Sonmez, Rifat [2 ]
Atan, Tankut [3 ]
Uysal, Furkan [4 ]
Bettemir, Onder Halis [5 ]
机构
[1] Transit & Rail Co, Toronto, ON, Canada
[2] Middle East Tech Univ, Civil Engn Dept, TR-06531 Ankara, Turkiye
[3] Bahcesehir Univ, Dept Ind Engn, TR-34353 Istanbul, Turkiye
[4] Amer Univ Middle East, Coll Engn & Technol, Egaila 54200, Kuwait
[5] Inonu Univ, Dept Civil Engn, TR-44280 Malatya, Turkiye
关键词
resource leveling; project scheduling; optimization; genetic algorithms; simulated annealing; memetic algorithms; HYBRID GENETIC ALGORITHM; HEURISTIC ALGORITHM; NEURAL-NETWORK; CONSTRUCTION; OPTIMIZATION; CONVERGENCE; SCHEDULES;
D O I
10.3390/buildings13112738
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, we present a novel memetic algorithm (MA) for the solution of the resource leveling problem (RLP). The evolutionary framework of the MA is based on integration of a genetic algorithm and simulated annealing methods along with a resource leveling heuristic. The main objective of the proposed algorithm is to integrate complementary strengths of different optimization methods and incorporate the individual learning as a separate process for achieving a successful optimization method for the RLP. The performance of the MA is compared with the state-of-the-art leveling methods. For small instances up to 30 activities, mixed-integer linear models are presented for two leveling metrics to provide a basis for performance evaluation. The computational results indicate that the new integrated framework of the MA outperforms the state-of-the-art leveling heuristics and meta-heuristics and provides a successful method for the RLP. The limitations of popular commercial project management software are also illustrated along with the improvements achieved by the MA to reveal potential contributions of the proposed integrated framework in practice.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] A hybrid genetic algorithm for resource leveling problem
    Zhao, Hanping
    Liu, Liming
    Jiang, Jiadong
    Li, Ke
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 786 - 790
  • [2] A genetic algorithm for the robust resource leveling problem
    Hongbo Li
    Erik Demeulemeester
    Journal of Scheduling, 2016, 19 : 43 - 60
  • [3] A genetic algorithm for the robust resource leveling problem
    Li, Hongbo
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (01) : 43 - 60
  • [4] h-NSDE—A Solution Algorithm for the Multi-objective Resource Leveling Problem
    Marinos Aristotelous
    Andreas C. Nearchou
    Operations Research Forum, 6 (1)
  • [5] Memetic Algorithm for the Balanced Resource Location Problem with Preferences
    Miskovic, Stefan
    Stanimirovic, Zorica
    2015 6TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS AND APPLICATIONS (IISA), 2015,
  • [6] Heuristic algorithm for resource leveling problem in emergency scheduling
    Liang, Yan
    Jin, Ye
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (06): : 1165 - 1171
  • [7] Genetic algorithm for resource leveling problem in project scheduling
    Liu, S.X.
    Wang, M.G.
    2001, Systems Engineering Society of China (21):
  • [8] A Memetic-GRASP Algorithm for the Solution of the Orienteering Problem
    Marinakis, Yannis
    Politis, Michael
    Marinaki, Magdalene
    Matsatsinis, Nikolaos
    MODELLING, COMPUTATION AND OPTIMIZATION IN INFORMATION SYSTEMS AND MANAGEMENT SCIENCES - MCO 2015 - PT II, 2015, 360 : 105 - 116
  • [9] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [10] An Effective Memetic Algorithm for Resource Constrained Project Scheduling Problem
    Rahman, Humyun Fuad
    Chakrabortty, Ripon Kumar
    Ryan, Michael J.
    2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 2160 - 2166